6.5 floors · 57 apartments · 40,288 sq ft · built 2025 · class C1 · owner of record: 1794 Clinton Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 56 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 40,288 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 177 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 177 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 473 days | No Cycle 10 report on record yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 2 PROPOSED 9 STORY BUILDING ACTIVE SITE. SIDEWALK SHED IN PLACE AT EXP#1 PERMIT#X01125090, CONTRARY TO PLANS/CODE. OBSERVED MUDSILLS/VERTICAL MEMBERS AT BASE LEVEL COVERED WITH CONCRETE/DEBRIS DIRT/OTHER MATERIAL #39559536Z | Dec 4, 2026 PENDING | $1,250 |
| Sep 23, 2026 | Construction CLASS - 2 PROPOSED 9 STORY NB ACTIVE SITE BELOW 75 FT. WORK CONTRARY TO APPROVED SITE SAFETY PLANS (SSP). PLANS SHOW ROOF PROTECTION OF ADJOINING PROPERTY/NO ROOF PROTECTION IN PLACE AT EXP#4 3309.10. NEEDLE BEAMS MISSIN #39559534P | Dec 4, 2026 PENDING | $1,250 |
| Sep 23, 2026 | Construction CLASS - 2 PROPOSED 9 BUILDING ACTIVE SITE. SUPPORTED SCAFFOLD INSTALLED IN PLACE PERMIT#X01458961. CONTRARY TO PLANS PLANS SHOW 3 FT MASONRY FRAMES AT BASE LEVEL AT CELLAR LEVEL. 6 FT WALK THRU FRAMES INSTALLED. NO DETAI #39559535R | Dec 4, 2026 PENDING | $1,250 |
| Jul 8, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554046N. FILE CERTIFICATE OF CORRECTION... #39556359N | Sep 18, 2026 DEFAULT | $1,280 |
| May 12, 2026 | Construction CLASS - 2 OBSERVED STORAGE ZONE AT STREET LEVEL OF JOBSITE. THE STORAGE ZONE HAS HEAVY MACHINERY W/OUT ADEQUATE PREVENTIVE MEASURES IN PLACE TO PREVENT GENERAL PUBLIC FROM GAINING ACCESS/ BEING EXPOSED TO SAID EQUIPMENT. #39554058K | Jan 22, 2027 | $2,400 |
| May 12, 2026 | Unknown CLASS - 1 3310.4-MAJOR BUILDING UNDER PERMIT # X01194388 CURRENTLY AT THE 6TH STORY LEVEL, PLANS SUBMITTED FOR 10 STORIES BUILDING W/OUT APPROVED SITE SAFETY PLAN BY THE DEPARTMENT. REFERENCE PAGE 10 - Z001-01, 23 - A-30 #39554046N | Jan 22, 2027 | $5,000 |
| May 12, 2026 | Unknown CLASS - 1 3310.5 SITE SAFETY MANAGER OR COORDINATOR TO BE DESIGNATED-MAJOR BUILDING UNDER PERMIT # X01194388 CURRENTLY AT THE 6THB STORY LEVEL, PLANS SUBMITTED FOR 10 STORIES BUILDING W/OUT DESIGNATION OF SITE SAFETY MAN #39554047P | Jan 22, 2027 | $5,000 |
| May 12, 2026 | Construction CLASS - 2 OBSERVED C-JOIST INSTALLED THROUGHOUT ENTIRE JOBSITE. ON EACH FLOOR STRAPS AND BLOCKING ARE INSTALLED IN CONTINUOUS AREAS COVERING FULL SPAN OF FLOOR FRAME. REVIEW OF DETAILS IN PROVIDED APPROVED PLANS SHOWS BL #39554057Z | Jan 22, 2027 | $1,250 |
| Jan 31, 2026 | Construction CLASS - 2 DURING MY INSPECTION. I OBSERVED A LULL EQUIPMENT PARK AT THE WORK AND STORAGE ZONE ALONG THE SIDEWALK SHED WITH NO PEDESTRIAN PROTECTION IN PLACE, NO 4' HIGH PLYWOOD WITH WIRE MESH UNDERSIDE OF THE SIDEWALK SH #39549737X | Sep 11, 2026 IN VIOLATION | $2,400 |
| Jan 31, 2026 | Unknown CLASS - 2 6-STORY NB AT THE SECOND FLOOR. ONE VIOLATION SERVED FOR NO COMPETENT WATCHPERSON ON DUTY AT THE SITE DURING ALL HOURS WHEN OPERATIONS ARE NOT IN PROGRESS. BUILDING, FOOTPRINT 6,470 SQFT. UPON WALKING THE PERIM #39549723P | Sep 11, 2026 IN VIOLATION | $2,500 |
| Jan 31, 2026 | Construction CLASS - 1 DURING MY INSPECTION OF A CLOSED 6-STORY NB. I OBSERVED TIMBER BARRIERS AT EXPOSURE 1 WORK AND STORAGE ZONE, REVIEWING THE POST DOT PERMITS, WHICH CALL FOR JERSEY BARRIERS, NOT TIMBER BARRIERS. STOP ALL OPERATI #39549738H | Sep 11, 2026 IN VIOLATION | $2,500 |
| Nov 11, 2025 | Construction CLASS - 2 OBSERVED AT EXPO#4 ADJACENT BUILDING HAS CRACKS AND CONCRETE DAMAGE FROM THE CONSTRUCTION OPERATIONS TAKING PLACE AT 1794 CLINTON AVE. CREATING UNSAFE STRUCTURAL CONDITIONS TO THE NEIGHBORING PROPERTY. UPON CHE #39546857R | Dec 14, 2026 DEFAULT | $5,030 |
| Oct 28, 2025 | Construction CLASS - 2 FAILURE TO SAFEGUARD - DUE TO ATOI OBSERVED SECTION OF THE LEFT SIDE REAR ADJACENT PROPERTY(1802 CLINTON AVE.) REAR YARD SLAB WAS DAMAGE & DIRT IS CAVING INTO SITE. THIS PARTIAL DAMAGE WAS CAUSE DURING ACTIVE O #39165152H | Jan 2, 2026 DEFAULT | $5,000 |
| Oct 28, 2025 | Construction CLASS - 2 WORK NOT CONFORM TO APPROVED PLANS PROVIDED ON JOB SITE UNDER PERMIT(S) # X01194388-S2-FO & X01194388-S1-SE, DUE TO AT TIME OF INSPECTION OBSERVED 10 NEW SOLDIER PILES INSTALLED AT FRONT AREA OF SITE & IS NOT I #39165134Y | Jan 2, 2026 DEFAULT | $5,000 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | ECB | Construction: PROPOSED 9 STORY BUILDING ACTIVE SITE. SIDEWALK SHED IN PLACE AT EXP#1 PERMIT#X01125090, CONTRARY TO PLANS/CODE. OBSERVED MUDSILLS/VERTICAL MEMBERS AT BASE LEVEL COVERED WITH CONCRETE/DEBRIS DIRT/OTHER MATERIAL | Open |
| Sep 23, 2026 | ECB | Construction: PROPOSED 9 STORY NB ACTIVE SITE BELOW 75 FT. WORK CONTRARY TO APPROVED SITE SAFETY PLANS (SSP). PLANS SHOW ROOF PROTECTION OF ADJOINING PROPERTY/NO ROOF PROTECTION IN PLACE AT EXP#4 3309.10. NEEDLE BEAMS MISSIN | Open |
| Sep 23, 2026 | ECB | Construction: PROPOSED 9 BUILDING ACTIVE SITE. SUPPORTED SCAFFOLD INSTALLED IN PLACE PERMIT#X01458961. CONTRARY TO PLANS PLANS SHOW 3 FT MASONRY FRAMES AT BASE LEVEL AT CELLAR LEVEL. 6 FT WALK THRU FRAMES INSTALLED. NO DETAI | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 9:21 PM ET. BBL 2029480029.