Brooklyn · Block 3100 · Lot 74 · 11206

179 Moore Street

4 floors · 25,100 sq ft · built 1931 · class H4 · owner of record: Z And R Moore Llc

4open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
189dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 25,100 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-07 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Mar 10, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB FTC VIOLATION #012926PI30103AG AND CONTROL #348451 ISSUE ON JAN 29TH, 2026, 2ND NOTICE TO OWNER FOR NOT SUBMITTING THE REQUIRED DOCUMENTS FOR CORRECTIVE ACTION P
#35718963N
Dec 3, 2026
PENDING
$2,500
DOB (3)
IssuedViolationStatus
Jan 29, 2026CONSTRUCTION
FTC W/COMMISSIONER'S ORDER CONTROL#348368 PLU 111925PI30101HZ DATED 11/19/2025 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 12/19/2025. AS OF 01/29/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH THE COMMISSIONER'S ORDER CONTROL#348368 PLUS 111925PI30101HZ
#PI30103AG
DOB VIOLATION - ACTIVE
Nov 19, 2025CONSTRUCTION
FTM BLDG IN CODE COMPLIANT MANNER-OBSVD @ EXP1 VERT AND HORIZONTAL CRACKS TWO AREAS BULGING STUCOO OVER DOORWAY & PARAPET WALL @ TOP LEFT SIDE PROGRESSIVE MASONRY CRACKS & BULGING.@ EXP4 DISLODGED STUCCO CRACKED MASONRY APPROX 100FT FROM S/W. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG DETERMINE
#PI30101HZ
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02998
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 8:44 AM ET. BBL 3031000074.

Look up another building