| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 67,488 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2062). Agency page | Dec 31, 2032 in 2239 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 10, 2026 | Unknown CLASS - 2 3314.4.4.9: OBS ACTIVE 8 STORY NB WITH EXTERIOR TEMPORARY EQUIP. @ EXPO 1. OUTRIGGER SUSPENDED SCAFF. ASSEMBLY INSTALLED @ EXPO 3. UPON REVIEW OF THE SUSPENDED SCAFFOLD MOTORS, ONE MOTOR WAS MISSING ITS IDENTIF #39557738H | Dec 3, 2026 PENDING | $2,500 |
| May 20, 2026 | Unknown CLASS - 1 3314.10 OBSERVED OUTRIGGER BEAM INSTALLED NOT PERPENDICULAR TO WALL AND NOT CENTERED ON PIPE FRAME SUPPORT. BEAM SHALL BE INSTALLED WITH ALL BEARING SUPPORTS PERPENDICULAR TO BEAM CENTERLINE AND MAINTAINED IN V #39554397P | Aug 9, 2027 DEFAULT | $5,030 |
| May 20, 2026 | Unknown CLASS - 1 3314.6.2 FAILURE TO PROTECT LIFE LINES FROM SHARP EDGES AND ABRASION CAUSING AHAZARDOUS CONDITION FOR PERSONNEL/WORKERS AND PUBLIC ,LIFE LINES IN USE WERE NOT PROTECTED OF CONTACT THAT INCLUDES ROOF TOP AND BU #39554398R | Aug 9, 2027 DEFAULT | $5,030 |
| May 20, 2026 | Construction CLASS - 1 OBS SUSPENDED SCAFFOLD INSTALLATION NOT CONFORMING TO APPROVED CD PLANS. SUSPENSION LINES INSTALLED WITH FIBER ROPE IN LIEU OF REQUIRED 3/8" WIRE ROPE WITH FIST GRIP CLAMPS.TIEBACK/OUTRIGGER ASSEMBLY&RIGGING CO #39554394J | Aug 9, 2027 DEFAULT | $2,530 |
| May 20, 2026 | Unknown CLASS - 1 3314.10.11 AT TIME OF INSPECTION, SUSPENDED SCAFFOLD AT EXPOSURE #1 OBSERVED NOT IN USE AND NOT LOWERED TO GROUND OR DECK AS REQUIRED. SCAFFOLD LEFT PARKED AT EXPO:#2 5TH FL ROOF DECK. NO DETAILS PROVIDED TO DE #39554395L | Aug 9, 2027 DEFAULT | $5,030 |
| May 20, 2026 | Unknown CLASS - 1 3314.15.2 OBSERVED SUSPENDED SCAFFOLD OUTRIGGERS, ROPES AND RIGGING IN PLACE AND READILY AVAILABLE FOR USE AT 5TH FLOOR ROOF, EXPOSURE 2. STIRRUPS INSTALLED APPROXIMATELY 3 FEET AND 2.5 FEET FROM PLATFORM ENDS, #39554396N | Aug 9, 2027 DEFAULT | $5,030 |
| Mar 13, 2026 | Site Safety CLASS - 1 SUPER FAILED TO ADEQUATELY SUPERVISE SITE OPERATIONS TO MAINTAIN A SAFE CONSTRUCTION SITE. HAZARDOUS CONDITIONS OBS INCLUDING SCAF PLANKS NOT SECURED, LOOSE NETTING @SCAFFOLD, MISSING GUARDRAILS,ELECT PANELS UN #39551781X | Nov 23, 2026 | $10,000 |
| Dec 26, 2025 | Cranes and Derricks CLASS - 2 AT TIME OF INSPECTION, A C-HOOK SUSPENDED SCAFFOLD WAS OBSERVED INSTALLED ON EXP 2 WITHOUT PRIOR NOTIFICATION TO THE DEPARTMENT OF BUILDINGS. FAILURE TO NOTIFY D.O.B BEFORE THE INSTALLATION OF C HOOK SYSTEM IS #39548512K | Mar 5, 2026 IN VIOLATION | $2,500 |
| Dec 26, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION, A SUSPENDED SCAFFOLD WAS OBSERVED ON SITE WITHOUT THE REQUIRED DOCUMENTATION. NO DESIGN DRAWINGS WERE AVAILABLE ON SITE, AND NO PRE- INSPECTION REPORT WAS PROVIDED FOR INSTALLED SUSPENDED #39548513M | Mar 5, 2026 IN VIOLATION | $1,250 |
| Sep 3, 2025 | Construction CLASS - 1 RESPONDENT PERMITTED YANCHATIPAN PILCO EDISON, FERNANDO TO OPERATE A KNUCKLE BOOM CRANE LIC PLATE #15736SR TO HOIST MATERIALS TO THE TOP OF A 5 STORY BUILDING. KNOWING HE DOES NOT POSSESS PROPER LICENSING., OBT #39159051H | Jan 14, 2027 | $5,000 |
| Jul 28, 2025 | Unknown CLASS - 1 RESPONDENT WAS ALLOWED CONSTRUCTION OPERATION WERE LED TO DAMAGE WINDOWS ON THE ADJACENT BUILDINGS AT EXPOSURE ONE AND FOUR, THE MASONS AND IRON REBAR WORKERS WERE PERFORMING WORK WHILE SOME CEMENT FALL ON WIND #39542898P | Feb 11, 2027 | $5,000 |
| Jul 28, 2025 | Construction CLASS - 1 AN EXISTING STOP WORK ORDER ON EXPOSURE 4, ORDER # OP-71-25-02675 DATED ON 2025-6-23 WHEN THE BUILDING WAS ON GROUND FLOOR LEVEL. AT THE VISIT TIME NOTED THAT THE BUILDING AT 3RD FLOOR LEVEL AT THE SAME EXPOSUR #39542897N | Feb 11, 2027 | $10,000 |
| Jun 23, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH CODE REQUIREMENT FOR 3307.4.7 WORK OR STORAGE ZONES. OBSERVED STREET STORAGE AREA RELATED TO THE CONSTRUCTION ADJACENT TO A SIDEWALK SHED AT EXPO 1, AND SUCH AREA WASN'T PROTECTED WITH A #39541654Y | Nov 16, 2026 | $2,400 |
| Jun 23, 2025 | Unknown CLASS - 1 FAILURE TO BUILD AND MAINTAIN PIPE SCAFFOLD AS PER CODE 3314.1, CREATING IMMEDIATE HAZARDS. SCAFFOLD MISSING GUARD RAILS, MUD SILLS, TOE BOARD AND INCLUDED CRACKED PLANKS, WHILE BEEN USED TO ERECT CONCRETE MASO #39541652K | Nov 16, 2026 | $5,000 |
| Jun 23, 2025 | Construction CLASS - 1 UPON REVIEWING SITE SAFETY PLAN, WE FOUND THAT THE SITE CONDITION WASN'T REFLECTING THE PLAN AS IT WAS MISSING TRAILER AND STORAGE AREA IN STREET, FENCE GATES IN DIFFERENT LOCATION AND MISSING FENCE AT EXPOSURE #39541651Z | Nov 16, 2026 | $2,500 |
| Jun 23, 2025 | Unknown CLASS - 1 RESPONDENT FAILED TO MAINTAIN SAFE OPERATION. OBSERVED NO OVERHEAD PROTECTION AT EXPOSURE 2AND 4. NO PROTECTION FOR ADJACENT YARD SPACES MATERIALS FELL, CREATING IMMEDIATE HAZARDOUS PEOPLE ACCESS THE AREAS IN #39541653M | Nov 16, 2026 | $10,000 |
| Dec 29, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION, 20 CUBIC YARDS OF COMBUSTIBLE DEBRIS LOCATED AT PREMISES, A VACANT LOT, POSING A FIRE AND VERMIN INFESTATION HAZARD TO ADJACENT OCCUPIED PREMISES, REPAIR AND/OR REPLACE; REMOVE ALL DEBRIS #39102439R | Mar 2, 2026 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #04494 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #04385 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #15534 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #35731 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #16291 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #36858 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #05600 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #02509 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #03626 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #02648 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #02321 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 10, 2026 | ECB | Unknown: 3314.4.4.9: OBS ACTIVE 8 STORY NB WITH EXTERIOR TEMPORARY EQUIP. @ EXPO 1. OUTRIGGER SUSPENDED SCAFF. ASSEMBLY INSTALLED @ EXPO 3. UPON REVIEW OF THE SUSPENDED SCAFFOLD MOTORS, ONE MOTOR WAS MISSING ITS IDENTIF | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Closed |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |