Bronx · Block 2799 · Lot 17 · 10457

1762 Topping Avenue

4 floors · 9 apartments · 5,904 sq ft · built 1899 · class C1 · owner of record: Island Interiors Group, Llc

22open violations
$17,500ECB/OATH penalties owed
3HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1156 days
Next cycle year 2029

Open violations

ECB / OATH (7) · $17,500 owed
IssuedViolationHearingBalance
Feb 5, 2026Construction CLASS - 2
TEMPORARY CONSTRUCTION FENCING PERMIT# 240170845 EXPIRED ON 03/27/2018., RENEW PERMIT; RENEW PERMIT
#39176109X
Apr 17, 2026
DEFAULT
$6,250
Feb 5, 2026Construction CLASS - 2
TEMPORARY CONSTRUCTION FENCING BOARD COLLAPSED AT EXPOSURE#1., COMPLY WITH CODE
#39176107M
Apr 17, 2026
DEFAULT
$5,000
Dec 30, 2022Unknown CLASS - 2
AT THE TIME OF INSPECTION, OBSERVED INSTALLED CONSTRUCTION FENCE AT EXPOSURE 1 WITHOUT PERMIT.
#39510987K
Mar 17, 2023
DEFAULT
$0
Nov 9, 2021Construction CLASS - 2
WORK W/OUT A PERMIT.AT THE TIME OF MY INSPECTION OF A ALT1 THE FOLLOWING WAS OBSERVED UPON ARRIVAL TO SITE,SITE WAS CLOSED & NOTICE THE CONSTRUCTION FENCE EXP.#1 WAS INSTALLED BUT THE PREVIOUS VIOLATION W/THE
#35582967K
Feb 4, 2022
DEFAULT
$6,250
Nov 2, 2019Construction CLASS - 2
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AT TIME OF INSPECTION I OBSERVED AT CONSTRUCTION SITE WAS PERFORM CONSTRUCTION SITE,DURING INSPECTION I OBSERVED A CONSTRUCTION
#35457201Y
Dec 20, 2019
IN VIOLATION
$0
Nov 2, 2019Construction CLASS - 2
FAILURE TO POST OR PROPERLY POST PERMIT FOR WORK AT PREMISES. AT TIME OF INSPECTION I OBSERVED AT CONSTRUCTION SITE WAS PERFORM CONSTRUCTIONSITE,DURING INSPECTION I NOTED THERE WAS NOT PERMIT POSTED FROM THIS S
#35457200M
Dec 20, 2019
IN VIOLATION
$0
Nov 2, 2019Construction CLASS - 2
JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. AT TIME OF INSPECTION I OBSERVED A CONSTRUCTION SITE WAS PERFORM CONSTRUCTION SITE,DURING INSPECTION I NOTED THERE WAS MISSING FENCE AT EXPOS
#35457099R
Dec 20, 2019
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
HPD (14) · C 3 · B 9 · A 2
IssuedClassViolationCorrect by
Feb 2, 2009BApt 1FL · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1FL, 1st STORYMar 9, 2009
Feb 2, 2009AApt 1FL · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 1FL, 1st STORYMay 8, 2009
Feb 2, 2009BApt 1FL · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1FL, 1st STORYMar 9, 2009
Feb 2, 2009BApt 1FL · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1FL, 1st STORYMar 9, 2009
Feb 2, 2009BApt 1FL · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE BATHROOM LOCATED AT APT 1FL, 1st STORYMar 9, 2009
Feb 2, 2009BApt 1FL · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 1FL, 1st STORYMar 9, 2009
Jan 29, 2009BApt 1FL · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORYMar 5, 2009
Jan 29, 2009BApt 1FL · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE CEILING'S AND WALL'S THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORYMar 5, 2009
Jan 29, 2009AApt 1FL · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR , IN THE KITCHEN LOCATED AT APT 1FL, 1st STORYMay 4, 2009
Jan 29, 2009BApt 1FL · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING , IN THE BATHROOM LOCATED AT APT 1FL, 1st STORYMar 5, 2009
Jul 3, 2006CSECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM , LOCKED DOOR AT FIRST STORY PUBLIC HALL LEADING TO AT BOILER ROOM, CELLARJul 18, 2006
Jul 3, 2006CApt 1 · SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, APARTMENT AT SOUTHJul 18, 2006
Jul 3, 2006BApt 12 · SECTION 27-2005 ADM CODE PROVIDE window guard IN THE 4th ROOM FROM EAST LOCATED AT APT 12, 1st STORY, APARTMENT AT SOUTHAug 16, 2006
Jul 3, 2006CApt 2 · SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT SOUTHJul 18, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 9:59 PM ET. BBL 2027990017.

Look up another building