5 floors · 29 apartments · 18,960 sq ft · built 1900 · class C7 · owner of record: 176-8 Urban Equity Associates Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 792 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 19, 2018 | Plumbing CLASS - 1 GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTIONS AND CERTIFICATIONS GIVEN BY THE DOB. I OBSERVED IN CELLAR UNDER CHICKEN RESTAURANT NEWLY INSTALLED GAS PIPING WITH FITTINGS AND SEALANT. PERMITS ARE ON FILE BU #35268531Y | Jun 21, 2018 WRITTEN OFF | $0 |
| Jan 19, 2018 | Plumbing CLASS - 1 FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. I OBSERVED IN CELLAR UNDER CHICKEN RESTAURANT NEWLY INSTALLED SINKS AND GREASE TRAPS WITH PIPING WHICH HAD NO PROPER TESTING PERFORMED ON ANY WATER AND/OR #35268533H | Jun 21, 2018 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 16, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00116 | DOB VIOLATION - ACTIVE |
| Sep 20, 1989 | CONSTRUCTION #A4VV02 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| May 16, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 20, 2018 | C | Apt 1C · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 1C, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 28, 2018 |
| Jun 20, 2018 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING MATERIAL AT CEILING AND WEST WALL AT PUBLIC HALL, 2nd STORY | Jul 25, 2018 |
| Jun 20, 2018 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT PUBLIC HALL, 2nd STORY | Sep 23, 2018 |
| Jun 20, 2018 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING MATERIAL AT CEILING AND WEST WALL AT PUBLIC HALL, 3rd STORY | Jul 25, 2018 |
| Jun 20, 2018 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT PUBLIC HALL, 3rd STORY | Sep 23, 2018 |
| Apr 9, 2014 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION INCINERATOR CLOSET DOORS NAILED AND SEALED SHUT PUBLIC HALL ALL STYS NORTH AND SOUTH SECTION. | Jul 13, 2014 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 7:54 PM ET. BBL 1004120046.