| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-12 (Accepted). Agency page | Dec 31, 2026 in 69 days | 5 of 5 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $364,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 121 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 58,424 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 313 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2049). Agency page | Dec 31, 2029 in 1165 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 21, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT TIME OF INSPECTION INCIDENT# 44928, AT EXPOSURE 3(BACK) 7 FLOOR EXTERIOR STUCCO SEPARATED FROM BUILDING FACADE AND COLLAPSED ONTO DRIVEWAY BELOW, 2ND FL #39157915R | Nov 5, 2025 DEFAULT | $25,000 |
| Oct 1, 2024 | Construction CLASS - 1 FAILURE TO SUBMMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPECTION OF APARKING STRUCTURE(PIPS) REPORT DOCUMENTING THE CONDITIONS OF PSID#B000 #37031078M | Feb 12, 2025 IN VIOLATION | $625 |
| Nov 4, 2023 | Construction CLASS - 2 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED AT 1ST FLOOR COMMERCIAL SPACE REMOVAL OF EXISTING PARTITION WALLS AND MECHANICAL VENTILATION DUCT WORK WITH NEW PARTITION WALL ERECTED. NO PERMITS OF JOB FI #39098803P | Jun 17, 2024 ADMIT/IN-VIO | $0 |
| Apr 25, 2022 | Boilers CLASS - 1 FLUE PIPE REDUSED IN SIZE. BOILER NOT VENTING PROPERLY #39060927N | May 5, 2023 IN VIOLATION | $1,250 |
| Apr 25, 2022 | Boilers CLASS - 1 BOILER FLUE PIPE UNDERSIZED. NOT VENTING PROPERLY. CEASED USE BOILERS #39060923X | May 5, 2023 IN VIOLATION | $0 |
| Apr 25, 2022 | Boilers CLASS - 1 BOILER FLUE PIPE REDUSED IN SIZE. NOT VENTING PROPERLY. #39060926L | May 5, 2023 IN VIOLATION | $1,250 |
| Apr 25, 2022 | Boilers CLASS - 1 FLUE PIPE REDUSED IN SIZE. NOT VENTING PROPERTLY #39060929R | May 5, 2023 IN VIOLATION | $1,250 |
| Apr 25, 2022 | Boilers CLASS - 1 FLUE PIPE REDUCED IN SIZE. NOT VENTING PROPERLY #39060933J | May 5, 2023 IN VIOLATION | $1,250 |
| May 12, 2020 | Construction CLASS - 2 SIDEWALK SHED/PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.AT TIME OF INSPECTION OF A 8 STY BLDG I OBSERVED SIDEWALK SHED AT EXP#1 & 2 NOT AS PER CODE DOES NOT EXTEND ADDITIONAL 5 FEET & COVER FULL #35491824J | Sep 16, 2020 IN VIOLATION | $2,400 |
| Aug 1, 2018 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #809524. REM: FILE ACCEPTABLE REPORT. #37012320H | Mar 25, 2019 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Aug 21, 2025 | CONSTRUCTION FAILURE TO MAINTAIN FACADE AND APPURTENANCES ON 8/21/25,A LARGE SECTIO N OF FACADE STUCCO AT 7TH FLOOR HAD COLLAPSED ONTO ADJACENT BUILDING 3 43 GOLD STREET DRIVEWAY GARAGE.BELOW FOR REASONS YET TO BE DETERMINED AT EXP3 SOUTH ELEV.REMEDY:OWNER TO RETAIN SERVICES OF A NYS REG DESIGN PROFESSIONAL WITH #FA0201AE | DOB VIOLATION - ACTIVE |
| Aug 21, 2025 | CONSTRUCTION REQUEST A ENGINEERS REPORT DUE TO EXPOSURE 3(BACK) WALL, 7 FLOOR MISSING SECTION OF STUCCO LARGE HOLE AND 2ND FLOOR BULGING AREA, AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGED CONDITIONS. #25-01995 | DOB VIOLATION - ACTIVE |
| Aug 21, 2025 | CONSTRUCTION EWO DUE TO LARGE SECTION OF FACADE STUCCO HAD COLLAPSED @7FL EXP3 S EL DUE TO THIS COLLAPSE THE OWNER IS TO IMMEDIATELY PROVIDE 1)PLOT PLAN W/DIMENSION NOTING AREAS TO BE CLOSED OFF. REMEDY:INSTALL SIDEWALK SHED @ ALL EXPS.RETAIN NYS REGISTERED PE/QEWI TO DIRECT AND SUPERVISE WORK.PE SUBMIT REPORT T #FA0202AE | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09386 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09384 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09385 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09388 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09387 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01093 | DOB VIOLATION - ACTIVE |
| Sep 7, 2021 | ELEVATOR #9027/706035 | DOB VIOLATION - ACTIVE |
| Jul 25, 2019 | ELEVATOR #9027/658429 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02130 | DOB VIOLATION - ACTIVE |
| Feb 16, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00471 | DOB VIOLATION - ACTIVE |
| Jul 26, 2018 | ELEVATOR #9027/633562 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01006 | DOB VIOLATION - ACTIVE |
| Sep 15, 2017 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST #02294 | DOB VIOLATION - ACTIVE |
| May 18, 2017 | FACADE SAFETY PROGRAM #HAZ86924 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #10503 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #10506 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #10505 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #10504 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #10502 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 16, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Sep 15, 2017 | Elevators EVCAT1 | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)