2 floors · 3 apartments · 3,672 sq ft · built 1901 · class C0 · owner of record: 1758 Anthony Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 2 DURING MY INSPECTION OF A CLOSED FD SITE. I OBSERVED INADEQUATE SIDEWALK CLEARANCE: NO 5-FOOT-WIDE PATHWAY, OBSTRUCTED BY TREE PROTECTION, JOBSITE FENCE, AND PLASTIC YODOK BARRIERS. MAINTAIN PEDESTRIAN PROTECTI #39559537K | Dec 4, 2026 PENDING | $2,400 |
| May 29, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED A 2 STORY HOUSE DOWN TO FOUNDATION. OBSERVED MECHANICAL EQUIPMENT IN OPERATION ON TOP OF DEBRIS. UPON RESEARCHING DOB RECORDS NO MECHANICAL DEMO PERMIT LOCATED. STOP ALL DEMO OPER #39554793R | Aug 7, 2026 DEFAULT | $6,250 |
| May 29, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED A 2-STORY HOUSE NEARLY FULLY DEMOLISHED. NO WINDOW PROTECTION, OVERHEAD PROTECTION INSTALLED AT EXP2. FENCE, PEDESTRIAN PROTECTION NOT SET UP AS PER PLANS. FAILURE TO SET UP THIS #39554894X | Aug 7, 2026 DEFAULT | $25,000 |
| May 29, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED EXCAVATOR ON SITE. BUILDING NEARLY FULLY DEMOLISHED. UPON REQUESTING FOR DEMO DRAWINGS WAS PROVIDED A 24-PAGE SET FOR FULL HAND DEMO. NO ADDITIONAL MECHANICAL DRAWING WERE PROVIDE #39554895H | Aug 7, 2026 DEFAULT | $25,000 |
| May 29, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED A 2-STORY HOUSE DEMOLISHED TO FOUNDATION. UPON RESEARCHING DOB RECORDS NOTIFICATION WAS GIVEN WITH A COMMENCEMENT DATE OF 6/2/26 TO START FULL DEMO. DEMOLITION OF THE STRUCTURE CO #39554896J | Aug 7, 2026 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Aug 22, 2025 | IMMEDIATE EMERGENCY SEAL ALL ACCESSIBLE GROUND FLOOR DOORS AND WINDOWS AROUND THE ENTIRE PERIMETER OF THE BUILDING TO PREVENT UNAUTHORIZED ACCESS #19490 | DOB VIOLATION - ACTIVE |
| May 8, 2025 | CONSTRUCTION UNLAWFUL ACTS.FAILURE TO COMPLY W/COMMISSIONER'S ORDER #012924CCER02JK ISSUED ON 1/29/2024. UP TO TODAY'S DATE NO PERMITS HAVE BEEN OBTAINED TO REPAIR STRUCTURALLY COMPROMISED RW. REMEDY:IMMEDIATELY COMPLY W/ COMMISSIONER'S ORDER 012924CCER02JK ISSUED 1/29/2024. RW UNIT, 280 BROADWAY, 4TH FLOOR,NEW #RW20502BH | DOB VIOLATION - ACTIVE |
| Jan 29, 2024 | CONSTRUCTION STRUCTURE RENDERD NON COMPLIANT AT EXPOSURE 3 OF A MULTIPLE DWELLING T HE RETAINING WALL HAS COLLAPSED ALONG WITH THE MAJORITY OF THE REAR YA RD . THE REMAINIONIG EARTH SLOPE IS STILL UNSAFE WITH POTENTIAL OF FUR THER COLLAPSE. OWNER HAS BEEN DIRECTED TO PROVIDE A STRUCTURAL STABILI TY REPORT CITING #CER02JK | DOB VIOLATION - ACTIVE |
| Jan 10, 2024 | CONSTRUCTION RETAINING WALL BETWEEN ANTHONY AVE AND CARTER AVE APPROXIMATELY OVER 150'-0" COLLAPSED. SECTION OF RETAINING WALL COLLAPSED ONTO CAR REPAIR SHOP AND DAMAGED REAR ROOF & WALL. #24-00086 | DOB VIOLATION - ACTIVE |
| Nov 20, 2020 | CONSTRUCTION FTM:RETAIN WALL @REAR PROP LINE OF A 2 STY+BSMT WOOD FRAME RESID BLDG RETAIN WALL STATE OF DISRPR,BULG&THERE IS POTENT OF COLLAPSE,RENDERING REAR YARD UNSAFE TO OCCUPY.OWNER TO IMMED VACATE REAR YARD TILL CONDNS SAFE.ENGAGE NYS PE TO EVAL THE WALL&PREP MONTR PROG.SUBM SIGN&SEAL RPT BY 12/15/2020.RPR #FEU20507XC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | ECB | Construction: DURING MY INSPECTION OF A CLOSED FD SITE. I OBSERVED INADEQUATE SIDEWALK CLEARANCE: NO 5-FOOT-WIDE PATHWAY, OBSTRUCTED BY TREE PROTECTION, JOBSITE FENCE, AND PLASTIC YODOK BARRIERS. MAINTAIN PEDESTRIAN PROTECTI | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 7:13 AM ET. BBL 2028900016.