2 floors · 6,825 sq ft · built 1930 · class E1 · owner of record: 165 Woodpoint Road Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-20 (Accepted). Agency page | Dec 31, 2026 in 64 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 29, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION I OBSERVED BIG PILE OF PIECES OF PLYWOOD/2X4/CONCRETE FORM WOOD AT THE EDGE OF BUILDING NEXT TO ADJ PROPERTY YARD(MATERIAL SHALL BE STORED AT LEAST 10 FEET FROM LEADING EDGE)-FALLING H #39559958Z | Dec 9, 2026 PENDING | $1,250 |
| Sep 29, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION I OBSERVED SIDEWALK SHED AT EXP#1 INSTALLED CONTRARY TO PLANS-AS PER PLAN 2 16' HIGH-17' WIDE BAYS TO BE INSTALLED NEXT TO EACH OTHER-ONLY INSTALLED 1 -16 FEET HIGH BAY #39559957R | Dec 9, 2026 PENDING | $1,250 |
| Sep 29, 2026 | Unknown CLASS - 2 BC 3307.4.7-WORK OR STORAGE ZONE-AT THE TIME OF MY INSPECTION I OBSERVED CINDERBLOCKS/MATERIAL STORED AT EXP#1 INSIDE STORAGE ZONE APPROX. 4/5 FEET HIGH-BAND TOGETHER WITH METAL SHARP STRAP-ACCESSIBLE FROM SIDE #39559954L | Dec 9, 2026 PENDING | $2,500 |
| Apr 30, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1&2 WITH NO FENCE PROJECT INFO PANEL INSTALLED AT EXPOS 2 CONTRARY TO CODE 3301.9.1.2 POSTING OF PROJECT INFORMATION PANELS. A PROJECT INFORMATION PANEL SHA #39553667L | Jul 8, 2026 IN VIOLATION | $1,250 |
| Apr 30, 2026 | Construction CLASS - 2 UPON INSPECTION AND REVIEW OF THE PROVIDED SITE SAFETY LOGISTICS PLAN I OBSERVED WORK CONTRARY TO PLANS. I OBSERVED A EXCAVATOR AND BOBCAT STORED ON THE 1ST FLR INSIDE A 2 STORY STRUCTURE (EXCAVATION PREFORMED) #39553674J | Jul 8, 2026 STIPULATION/IN-VIO | $620 |
| Apr 30, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1&2 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. MISSING VIEWING PANEL AT EXPOS 1. FENCE NOT FULLY PAINTED HUNTER GREEN AT EXPOS 1 (WOOD PANELS) & 2 (GR #39553666J | Jul 8, 2026 IN VIOLATION | $1,000 |
| Apr 30, 2026 | Construction CLASS - 2 UPON INSPECTION OF A PROPOSED 5 STORY ALT CONSTRUCTION SITE I OBSERVED A DAMAGED PARAPET ON THE ROOF AND ON GOING WORK AT EXPOS 3 WITH NO OVERHEAD PROTECTION PROVIDED FOR THE ADJOINING PROPERTY REAR YARD AS PER #39553670M | Jul 8, 2026 STIPULATION/IN-VIO | $620 |
| Apr 30, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&2 CONTRARY TO CODE. MULTIPLE VERTICAL BEAMS PLACED WITHIN 18IN FROM THE FACE OF THE CURB LINE AT EXPOS 1 CONTRARY TO CODE 3307.6.4.4 VERTICAL MEMB #39553663Y | Feb 9, 2027 | $2,400 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #29474 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 29, 2026 | ECB | Construction: AT THE TIME OF INSPECTION I OBSERVED BIG PILE OF PIECES OF PLYWOOD/2X4/CONCRETE FORM WOOD AT THE EDGE OF BUILDING NEXT TO ADJ PROPERTY YARD(MATERIAL SHALL BE STORED AT LEAST 10 FEET FROM LEADING EDGE)-FALLING H | Open |
| Sep 29, 2026 | ECB | Construction: AT THE TIME OF INSPECTION I OBSERVED SIDEWALK SHED AT EXP#1 INSTALLED CONTRARY TO PLANS-AS PER PLAN 2 16' HIGH-17' WIDE BAYS TO BE INSTALLED NEXT TO EACH OTHER-ONLY INSTALLED 1 -16 FEET HIGH BAY | Open |
| Sep 29, 2026 | ECB | Unknown: BC 3307.4.7-WORK OR STORAGE ZONE-AT THE TIME OF MY INSPECTION I OBSERVED CINDERBLOCKS/MATERIAL STORED AT EXP#1 INSIDE STORAGE ZONE APPROX. 4/5 FEET HIGH-BAND TOGETHER WITH METAL SHARP STRAP-ACCESSIBLE FROM SIDE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 10:29 PM ET. BBL 3028840006.