3 floors · 2 apartments · 4,125 sq ft · built 1928 · class S2 · owner of record: Melo Z Phantom Cap Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-01-15 (Accepted). Agency page | Dec 31, 2026 in 62 days | 2 of 2 without an accepted 2026 report yet |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 427 days | Next cycle year 2027 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 15, 2026 | CONSTRUCTION REQUESTING A STRUCTURAL REPORT DUE TO FIRE-DAMAGED STRUCTURAL WOOD JOISTS LOCATED AT THE REAR PORTION OF THE 1ST AND 2ND STORIES. THE JOISTS HAVE SUSTAINED SIGNIFICANT FIRE DAMAGE, POTENTIALLY COMPROMISING THE STRUCTURAL INTEGRITY AND STABILITY OF THE AFFECTED AREAS OF THE BUILDING. #26-01569 | DOB VIOLATION - ACTIVE |
| Jun 15, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE DAMAGE. FIRE HAS CAUSED EXTENSIVE WATER AND SMOKE DAMAGE THROUGHOUT THE REAR PORTIONS OF THE 1ST AND 2ND STORIES. SECTIONS OF THE ROOF, WALLS, AND WINDOWS REMOVED, LEAVING THE STRUCTURE OPEN TO THE ELEMENTS. ADDITIONALLY, STRUCTURAL WOOD JOISTS HAVE SUSTA #26-01568 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 16, 2026 | Structurally Compromised Buildings FTF-SC-INITL Report due for structurally compromised property | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 16, 2026 | DOB Safety | Structurally Compromised Buildings: Report due for structurally compromised property | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 2:28 PM ET. BBL 2040300020.