Brooklyn · Block 6746 · Lot 6 · 11230

1712 Avenue M

2 floors · 2 apartments · 3,700 sq ft · built 1931 · class S2 · owner of record: 1712 Avenue M Llc

18open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
432dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 311 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 432 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-23 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Sep 27, 2019Construction CLASS - 2
OBSERVED IN REAR YARD OF PROPERTY AT EXPOSURE 3, A SHED HAS BEEN CONSTRUCTED OF 2 BY 4S & PLYWOOD APPROX 10FT HIGH & 16FT WIDE & 12FT LONG, STRUCTURE IS ATTACHED TO THE REAR OF THE BUILDING & ENCLOSES A WALK IN
#39010233N
Jun 10, 2021
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (17) · C 2 · B 11 · A 4
IssuedClassViolationCorrect by
Jun 25, 2008CSECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING OF 1ST STORY PUBLIC HALL 1ST TO 2ND STORY ER1Jul 1, 2008
Jun 25, 2008ASECTION 27-2043 ADMIN. CODE: PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT 2ND STORY FRONT APT.Sep 28, 2008
Jun 25, 2008BSECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN MICE AND ROACHES KITCHEN 2ND STORY FRONT APT.Jul 30, 2008
Jun 25, 2008BSECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALL OF BATHROOM FRONT ROOM AND KITCHEN 2ND STORY FRONT APT.Jul 30, 2008
Jun 25, 2008BSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED WIRING CEIILING OF 2ND ROOM FROM FRONT 2ND STORY FRONT APT.Jul 30, 2008
Jun 25, 2008BSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE WINDOW GLASS LOWER SASH FRONT ROOM 2ND STORY FRONT APT.Jul 30, 2008
Jun 25, 2008ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS APT 2ND STORY FRONT APT.Sep 28, 2008
Jun 25, 2008ASECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE SLIDING CLOSET DOOR PRIVATE HALL 2ND STORY FRONT APT.Sep 28, 2008
Jul 3, 2006CSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MILDEW AT BATHROOM CEILING 2 STORY APT. # 2F.Jul 21, 2006
Jul 3, 2006ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING THROUGHOUT 2 STORY APT. # 2F.Oct 18, 2006
Jul 3, 2006BSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS AT BOTTOM SASH WINDOW AT KITCHEN 2 STORY APT. #2F.Aug 19, 2006
Jul 3, 2006BSECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK THROUGHOUT 2 STORY APT. # 2F.Aug 19, 2006
Jul 3, 2006BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILE AT BATHROOM 2 STORY APT. # 2F.Aug 19, 2006
Jul 3, 2006BSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF WINDOW AT FRONT ROOM NAIL SHUT 2 STORY APT. # 2F.Aug 19, 2006
Jul 3, 2006BSECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT 2 STORY PUBLIC HALL STAIR.Aug 19, 2006
Jul 3, 2006BSECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS HOT WATER FIXTURE AT WAHBASIN AT BATHROOM 2 STORY APT. # 2F.Aug 19, 2006
Jul 3, 2006BSECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WASH BASIN AT BATHROOM 2 STORY APT. # 2F.Aug 19, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 8:39 AM ET. BBL 3067460006.

Look up another building