Bronx · Block 2790 · Lot 147 · 10457

1711 Clay Avenue

3 floors · 3 apartments · 3,219 sq ft · built 2004 · class C0 · owner of record: Winston Garcia

12open violations
$7,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
60dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 60 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Registered through 2027-09-01

Open violations

ECB / OATH (3) · $7,250 owed
IssuedViolationHearingBalance
May 8, 2018Zoning CLASS - 3
ZR 25-621 FAILURE TO COMPLY W/ZR-NO COMPLIANT PARKING IN FRONT YARD OFRESIDENTIAL LOT.GREEN TOYOTA CAMARY W/PLATE #NYS T640305C PARKED @FRONT YARD.AS PER ZR 25-621, PARKING IS DISALLOWED IN FORNT YARD WHERE RE
#35310850H
Oct 12, 2018
DEFAULT
$500
May 8, 2018Construction CLASS - 3
FENCE EXCEEDS PERMITTED HEIGHT IN A R7-1 GENERAL RESIDENCE DISTRICT .@TIME OF INSP OBSERVED FRONT YARD FENCE APPROX 5'5" EXCEEDING THE MAXIMUM HEIGHT OF 4' @FRONT YARD IN A RESIDENTIAL DISTRICT.REM:CONFORM TO Z
#35310851J
Oct 12, 2018
DEFAULT
$500
May 8, 2018Construction CLASS - 2
WORK W/OUT A PERMIT.@TIME OF INSP OBSERVED AN ERECTED STEEL STRUCTURE (CARPORT) APPROX 19' X 10' X 24' @EXP#1 DOB RECORDS INDICATE NO PERMIT HAS BEEN OBTAINED.100% OF THE WORK IS COMPLETED.REM:OBTAIN PERMIT IF
#35310824Y
Oct 12, 2018
DEFAULT
$6,250
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (9) · C 0 · B 5 · A 4
IssuedClassViolationCorrect by
Aug 6, 2026A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 3rd STORYNov 9, 2026
Aug 6, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 3rd STORYNov 9, 2026
Aug 6, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 3rd STORYSep 10, 2026
May 8, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 11, 2026
Feb 6, 2026BApt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 13, 2026
Feb 6, 2026BApt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOORS IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 13, 2026
Feb 6, 2026BApt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOORS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 13, 2026
Dec 31, 2024A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS, ALL STORIES AT PUBLIC HALL STAIRSApr 5, 2025
Sep 12, 2024BApt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTHOct 17, 2024

Issued in the last 120 days

DateSourceWhatNow
Aug 6, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 3rd STORYOpen
Aug 6, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 3rd STORYOpen
Aug 6, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 3rd STORYOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 3:38 PM ET. BBL 2027900147.

Look up another building