3 floors · 4 apartments · 94,794 sq ft · built 1963 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-13 (Accepted). Agency page | Dec 31, 2026 in 51 days | 2 of 4 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 94,794 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 416 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 12495). Agency page | Dec 31, 2035 in 3338 days | Next due 2035 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 1, 2026 | Construction CLASS - 2 REISSUE ON ECB#35724675J EXIT DOOR NOT SELF CLOSING.NOTED:EMERGENCY EXTERIOR EXIT DOOR NOT SELF-CLOSING PROPERLY DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON EXTERIOR EMERGENCY EXIT#4(1)DOOR 1ST FL,EXIT 3 1 #35732060N | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 1, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STEP CRACKAT THE CORNER OF EXPOSURE#1 AND #2 ON THE 3RD FLOOR AND A VERTICAL CRACK AT THE CORNER OF EXPOSURE#1 AND EXPOSURE#3 ON 3RD FLOOR AND AT EXPO #35732099K | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 1, 2026 | Construction CLASS - 2 REISSUE ON ECB#35724677N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT GAS METER ROOM STORAGE OF COMBUSTIBLE MATERIALS WITHLIGHT BULBS,BATTERIES,TABLES,CHAIRS AND STEEL PARTS OBSERVED UPON INSP #35732058Y | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 1, 2026 | Construction CLASS - 2 REISSUE ON ECB#35724676L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATED CLASSROOM AND SMOKE DOORS NOT CLOSING PROPERLY DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON CLASSROOMS 353,346 #35732059X | Jul 15, 2026 POP/IN-VIO | $0 |
| Sep 25, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT GAS METER ROOM, OBSERVED LIGHT BULBS STORAGE, INSIDE AS STORAGE, ELECTRIC METER ROOM HAS TWO TABLE, 8 CHAIRS INSIDE THE RM. REMEDY: REMOVE MATERI #35724677N | Oct 23, 2025 POP/IN-VIO | $0 |
| Sep 25, 2025 | Construction CLASS - 2 RE-ISSUE #35677487N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIOR SMOKE DOORS DO NOT SELF-CLOSE PROPERLY AT "CAFETERIA EXIT 11", "DOOR K", "L", AT "STAIR H 2 DOORS", "STAIR L(A) DOOR", #35724676L | Oct 23, 2025 POP/IN-VIO | $0 |
| Sep 25, 2025 | Construction CLASS - 2 RE-ISSUE #35677488P. EXIT DOOR NOT SELF-CLOSING. NOTED: AT CELLAR "EXIT 3". 1ST FLR-"EXIT 11", EXIT 2". DOORS DO NOT SELF-CLOSE PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35724675J | Oct 23, 2025 POP/IN-VIO | $0 |
| Jul 1, 2024 | Construction CLASS - 2 REISSUE #35676515R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CAFETERIA EXIT #11, DOOR K, L, AT STAIR "H" 2 DOORS, STAIR "L" A DOOR, CLASS ROOM DOOR 219, 244 DO NOT CLOSE PROPERLY. REMEDY #35677487N | Sep 27, 2024 POP/IN-VIO | $0 |
| Jul 1, 2024 | Construction CLASS - 2 REISSUE #35676514P. EXIT DOOR NOT SELF-CLOSING. NOTED: AT CELLAR EXIT #3, EXIT #11, EXIT #2 DOORS DONOT SELF-CLOSE. REMEDY: REPAIR/REPLACE DOOR. #35677488P | Sep 27, 2024 POP/IN-VIO | $0 |
| Aug 10, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT AUDITORIUM RIGHT SIDE OF STAGE DOOR SLAM TOO HARD, AT CAFETERIA EXIT #11, DDOOR K,L, DO NOT CLOSE PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35676515R | Sep 25, 2023 POP/IN-VIO | $0 |
| Aug 10, 2023 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: AT CELLAR EXIT #3, STORAGE ROOM, AT FIRST FLOOR EXIT #11, EXIT DOORS ARE JAMMED NEEDS EXCESSIVE FORCE TO OPEN. REMEDY: REPAIR/REPLACE DOOR. #35676514P | Sep 25, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 11, 2019 | ELEVATOR #9027/665057 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #04117 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 6:09 PM ET. BBL 4124950166.