Brooklyn · Block 6746 · Lot 44 · 11230

1701 Avenue N

6 floors · 84 apartments · 90,000 sq ft · built 1938 · class D4 · owner of record: 1717 Avenue N, Inc.

70open violations
$0ECB/OATH penalties owed
11HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6746). Agency page

Dec 31, 2026
in 65 days
Due this year
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 90,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 430 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jul 26, 2012Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. DEFECT NOTED: SOME A/C UNITS THROUGHOUT ALL EXPS OR SIDE BLDG INSTALLED W/O PROPER SUPPORTS OR MANUFACTURERS RECOMMENDED BRACKETS. REMEDY:MAINTAIN BLDG INSTALL
#34985106Z
Sep 10, 2012
STIPULATION/IN-VIO
$0
Apr 13, 2012Unknown CLASS - 3
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.WINDOW A/C UNITSIN SOME CASES ARE BEING SUPPORTED BY BRICKS & VARIOUS LUMBER.SUPPORTS ARE QUESTIONABLE.AT REAR OF BLDG(EXPOSURE 3)WINDOWS IN SOME AREAS CONT
#34945631K
Jun 4, 2012
DEFAULT
$0
DOB (9)
IssuedViolationStatus
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00861
DOB VIOLATION - ACTIVE
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
#00297
DOB VIOLATION - ACTIVE
Aug 21, 2022FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
#00736
DOB VIOLATION - ACTIVE
Jun 20, 2021FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
#00786
DOB VIOLATION - ACTIVE
Jun 29, 2020FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
#00651
DOB VIOLATION - ACTIVE
Mar 18, 2019FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)
#00427
DOB VIOLATION - ACTIVE
Mar 17, 2019FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)
#00099
DOB VIOLATION - ACTIVE
Mar 16, 2019FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016
#10054
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#07204
DOB VIOLATION - ACTIVE
DOB NOW Safety (12)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Apr 22, 2023Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Aug 21, 2022Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Jun 20, 2021Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Jun 29, 2020Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Mar 18, 2019Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Mar 17, 2019Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Mar 16, 2019Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
HPD (47) · C 11 · B 32 · A 4
IssuedClassViolationCorrect by
Oct 19, 2026CApt 6M · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHNov 2, 2026
Sep 30, 2026BApt 2H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHNov 4, 2026
Sep 30, 2026AApt 2H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT THE CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHJan 3, 2027
Sep 30, 2026BApt 2H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHNov 4, 2026
Jul 17, 2026AApt 2H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT WEST RISER IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM SOUTH AT WESTOct 20, 2026
Jul 17, 2026AApt 2H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM SOUTH AT WESTOct 20, 2026
Jul 17, 2026BApt 2H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM SOUTH AT WESTAug 21, 2026
Feb 19, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAMay 25, 2026
Jan 20, 2026BApt 2K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ/FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18239512 ISSUED 18-SEP-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2Feb 24, 2026
Dec 29, 2025BApt 2A · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 2, 2026
Dec 29, 2025BApt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 2, 2026
Feb 18, 2025BApt 2A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''Mar 25, 2025
Feb 18, 2025BApt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 5th APARTMENT FROM EAST AT SOUTHMar 25, 2025
Feb 18, 2025BApt 1H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 5th APARTMENT FROM EAST AT SOUTHMar 25, 2025
Aug 10, 2023BApt 1H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST ORIGINAL VIOLATION 15913850 ISSUED 10-APR-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRSep 14, 2023
Aug 10, 2023BApt 1H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST ORIGINAL VIOLATION 15920526 ISSUED 10-APR-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRSep 14, 2023
Jun 15, 2023BApt 6D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 20, 2023
Jun 15, 2023BApt 1A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1A, 1st STORY, 5th APARTMENT FROM WEST AT NORTHJul 20, 2023
Jun 15, 2023BApt 1F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTHJul 20, 2023
Jun 15, 2023BApt 1N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1N, 1st STORY, 3rd APARTMENT FROM WEST AT NORTHJul 20, 2023
Jun 15, 2023BApt 2H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM EAST AT SOUTHJul 20, 2023
Jun 15, 2023BApt 2K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2K, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTJul 20, 2023
Jun 15, 2023BApt 3E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTHJul 20, 2023
Jun 15, 2023BApt 3J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 20, 2023
Jun 15, 2023BApt 3K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTJul 20, 2023
Jun 15, 2023BApt 4E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHJul 20, 2023
Jun 15, 2023BApt 4K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTJul 20, 2023
Jun 15, 2023BApt 5D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 20, 2023
Jun 15, 2023BApt 5G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTJul 20, 2023
Jun 15, 2023BApt 5M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 20, 2023
Jun 15, 2023BApt 6F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6F, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHJul 20, 2023
Jun 15, 2023BApt 6M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 20, 2023
Jun 1, 2023CApt 1H · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Jun 5, 2023
Jun 1, 2023CApt 1H · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Jun 5, 2023
May 15, 2023CApt 2H · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AJun 8, 2023
May 12, 2023BApt 2H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTHJun 16, 2023
May 12, 2023BApt 2H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTHJun 16, 2023
Apr 13, 2023CApt 1H · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AMay 7, 2023
Apr 12, 2023BApt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, CEILING, NORTH WALL, CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WESTMay 17, 2023
Nov 9, 2022CApt 1F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTHDec 5, 2022
Nov 30, 2016CApt 1N · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE KITCHEN LOCATED AT APT 1N, 1st STORY, 3rd APARTMENT FROM WEST AT NORTDec 28, 2016
Nov 29, 2016CApt 1N · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 1N,Dec 27, 2016
Nov 23, 2016CApt 3J · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 8; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 1st APADec 21, 2016
Jun 11, 2015CApt 3J · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 8; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 1st APAJul 9, 2015
Aug 5, 2013BApt 1N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1N, 1st STORY, 3rd APARTMENT FROM WEST AT NORTHSep 9, 2013
Jul 16, 2013BApt 1N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 1N, 1st STORY, 3rd APARTMENT FROM WEST AT NORTHAug 20, 2013
Sep 11, 2000CApt 5J · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. CEILING, WEST WALL, NORTH WALL IN THE 3rd BEDROOM FROM NORTH AT WEST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 11, 2000

Issued in the last 120 days

DateSourceWhatNow
Oct 19, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 30, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHOpen
Sep 30, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT THE CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHOpen
Sep 30, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHOpen
Jul 17, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT WEST RISER IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM SOUTH AT WESTOpen
Jul 17, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM SOUTH AT WESTOpen
Jul 17, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM SOUTH AT WESTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 9:30 AM ET. BBL 3067460044.

Look up another building