6 floors · 55 apartments · 43,000 sq ft · built 1929 · class D1 · owner of record: Longfellow Avenue Housing Development Fu Nd Company
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 43,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-30 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 22, 2023 | Boilers CLASS - 2 FLUE PIPE IS ROTTED AND IT HAS SMALL HOLES/ BAROMETRIC DAMBER NOT WORKING PROPELY/CORRECT ALL VIOLATING CONDITIONS /SUBMIT CERTIFICATE OF CORRECTIONS #39086792K | Aug 4, 2023 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06345 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05912 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #22780 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #06856 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #04769 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #05355 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 22, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLY'S AT HOPPER DOOR AT PUBLIC HALL, 4th STORY | Jul 27, 2026 |
| Jun 22, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLY'S AT STREET TO VESTIBULE DOOR , 1st STORY | Jul 27, 2026 |
| Jun 22, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT HOPPER DOOR AT PUBLIC HALL, 4th STORY | Jul 6, 2026 |
| Jun 22, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT STREET TO VESTIBULE DOOR , 1st STORY | Jul 6, 2026 |
| Jun 2, 2026 | B | Apt 3G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT NORTH & WEST WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH ORIGINAL VIOLATION 18607868 ISSUED 31-JAN- | Jul 7, 2026 |
| May 15, 2026 | B | Apt 5B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 18572199 ISSUED 14-JAN-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27- | Jun 19, 2026 |
| Mar 11, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ITS ASSEMBLY AT BUILDING ENTRNANCE DOOR FROM STREET TO VESTIBULE AT PUBLIC HALL, 1st STORY | Apr 15, 2026 |
| Mar 11, 2026 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING INFORMATION AT PUBLIC HALL, 1st STORY | Mar 17, 2026 |
| Mar 11, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Apr 15, 2026 |
| Mar 11, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Jun 14, 2026 |
| Mar 6, 2026 | A | Apt 5D · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 9, 2026 |
| Feb 17, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM AT BOILER ROOM | Feb 23, 2026 |
| Feb 2, 2026 | A | Apt 3G · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ESCUTCHEON PLATE AT CEILING RISER. IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | May 8, 2026 |
| Feb 2, 2026 | C | Apt 3G · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Feb 1, 2026 |
| Feb 2, 2026 | B | Apt 6H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FT. AT CEILING IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH | Mar 9, 2026 |
| Feb 2, 2026 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH | Feb 28, 2026 |
| Feb 2, 2026 | A | Apt 3G · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | May 8, 2026 |
| Feb 2, 2026 | B | Apt 6H · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN IN WASTELINE UNDER WASHBASIN IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH | Mar 9, 2026 |
| Feb 2, 2026 | B | Apt 3G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING ,NORTH AND WEST WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Mar 9, 2026 |
| Feb 2, 2026 | B | Apt 3G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH AND WEST WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Mar 9, 2026 |
| Feb 2, 2026 | C | Apt 3G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Feb 28, 2026 |
| Feb 2, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Feb 8, 2026 |
| Feb 2, 2026 | B | Apt 3G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING ,EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | Mar 9, 2026 |
| Feb 2, 2026 | A | Apt 3G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING ,EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTH | May 8, 2026 |
| Jan 15, 2026 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WINDOW SASH BALANCES AT WEST WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 19, 2026 |
| Dec 26, 2025 | A | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH WINDOW GLASS IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 31, 2026 |
| Oct 6, 2025 | B | Apt 6G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 10, 2025 |
| Oct 6, 2025 | C | Apt 6G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 1, 2025 |
| Oct 6, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY | Oct 20, 2025 |
| Jun 30, 2025 | A | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER ESCUTCHEON PLATE AT HEAT RISER IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 3, 2025 |
| Jun 30, 2025 | B | Apt 5D · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASHBASIN IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 4, 2025 |
| Jun 30, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Oct 3, 2025 |
| Jun 30, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Aug 4, 2025 |
| Jun 30, 2025 | B | Apt 5D · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 4, 2025 |
| May 6, 2025 | B | Apt 6G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''1700'', 1st FROM WEST AT NORTH ORIGINAL VIOLATION 17595442 ISSUED 04-JAN-25 HAS BEEN UPG | Jun 10, 2025 |
| Mar 3, 2025 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE FOYER LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Jun 6, 2025 |
| Mar 3, 2025 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Jun 6, 2025 |
| Mar 3, 2025 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Apr 7, 2025 |
| Mar 3, 2025 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Jun 6, 2025 |
| Mar 3, 2025 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS AT SOUTH AND WEST WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Apr 7, 2025 |
| Mar 3, 2025 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Jun 6, 2025 |
| Mar 3, 2025 | C | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RADIATOR AIR VALVE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Mar 9, 2025 |
| Mar 3, 2025 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Apr 7, 2025 |
| Mar 3, 2025 | B | Apt 5D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Apr 7, 2025 |
| Mar 3, 2025 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Jun 6, 2025 |
| Feb 27, 2025 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 3, 2025 |
| Feb 27, 2025 | B | Apt 5D · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS FAUCET AT SINK IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-E'', AT SOUTH | Apr 3, 2025 |
| Feb 24, 2025 | A | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT NORTH WALL IN THE FOYER LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2025 |
| Feb 24, 2025 | A | Apt 5D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2025 |
| Feb 24, 2025 | B | Apt 5D · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 31, 2025 |
| Feb 24, 2025 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH AT WINDOW IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 31, 2025 |
| Feb 24, 2025 | B | Apt 5D · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRING AT LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 31, 2025 |
| Feb 24, 2025 | B | Apt 5D · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 31, 2025 |
| Feb 24, 2025 | B | Apt 5D · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 31, 2025 |
| Feb 21, 2025 | A | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 27, 2025 |
| Feb 21, 2025 | B | Apt 5D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 28, 2025 |
| Feb 21, 2025 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO THE NORTH WALL IN THE FOYER LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 28, 2025 |
| Feb 21, 2025 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 27, 2025 |
| Feb 21, 2025 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW PANE AT UPPER SASH AT WEST WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 28, 2025 |
| Feb 19, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM LOCKED AT BOILER ROOM | Feb 25, 2025 |
Showing 60 of 175. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 8:37 PM ET. BBL 2030100017.