Manhattan · Block 822 · Lot 23 · 10011

17 West 20 Street

6 floors · 16,724 sq ft · built 1852 · class O5 · owner of record: Hh West 20th, Llc

2open violations
$1,562ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1143dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $1,562 owed
IssuedViolationHearingBalance
Oct 25, 2021Boilers CLASS - 2
BOILER LEAK AT FRONT TUBE DOOR-CONTROL PIPING UNDERSIZED-CONTROLS PIPED W/O SIPHON-NO CLEANOUT AT CHIMNEY BASE-NO GUARDS AT GAGE GLASS-CONTROLS W/O COVERS
#39049917M
Dec 9, 2021
DEFAULT
$1,562
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 4:55 PM ET. BBL 1008220023.

Look up another building