3 floors · 6 apartments · 5,175 sq ft · built 1930 · class C2 · owner of record: 17-13 Himrod Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-07 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 3, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. DEFECT IS: MD BLDG APT #3L CARBON MONOXIDE AND SMOKE DETECTORS DISCONNECTED IN KITCHEN AREA AND BED (R). RMDY: REPAIR AND/OR REPLACE. #35112299H | Feb 21, 2017 STIPULATION/IN-VIO | $0 |
| Jul 24, 2016 | Construction CLASS - 3 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT BATHROOM EVIDENCE OF CONCEALED WATER LEAK MIRIOR DAMAGE TO CEILING & WALLS. REMEDY: REPAIR &/OR REPLACE. #35196910Y | Sep 13, 2016 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #15646 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #15544 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| May 2, 2024 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL BX CABLE AT CEILING OF CELLAR | Jun 6, 2024 |
| May 2, 2024 | C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING BRACKET UNDER 2ND STORY BALCONY AT REAR YARD AT FIRE ESCAPE | May 8, 2024 |
| May 2, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT ENTRANCE DOOR AT BOTTOM OF CELLAR STAIRS FROM 1ST STORY | May 16, 2024 |
| May 2, 2024 | A | Apt 2R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACOUSTIC CEILING TILE AT ROOM EAST 2, EAST 4 AND PRIVATE HALL LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 5, 2024 |
| May 2, 2024 | B | § 53,187,231 M/D LAW & DEPT RULES & REG. PROVIDE MEANS OF EGRESS FROM YARD TO STREET BY FIREPROOF PASSAGEWAY FOR WHICH APPLICATION MUST BE FILED FOR APPROVAL,OR BY UNLOCKED DOOR OR GATE IN FENCE TO ADJOINING PREMISES WITH CONSENT OF ADJACENT OWNER. | Jun 6, 2024 |
| May 2, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING OF CELLAR | May 8, 2024 |
| Apr 13, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STONE TREAD 2ND FROM BOTTOM AT STOOP AT FRONT YARD | May 18, 2023 |
| Oct 15, 2019 | B | Apt 2R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 12 SQFT) CEILING, SOUTH ,EAST AND WEST WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 19, 2019 |
| Mar 26, 2018 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 30, 2018 |
| Mar 26, 2018 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 30, 2018 |
| Dec 1, 2017 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 5, 2018 |
| Apr 27, 2017 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 1, 2017 |
| Feb 27, 2017 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, APARTMENT AT SOUTH | Apr 3, 2017 |
| Dec 21, 2016 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT FRONT YARD | Jan 25, 2017 |
| Sep 23, 2016 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 28, 2016 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 1:10 AM ET. BBL 4034290048.