2.75 floors · 3 apartments · 3,410 sq ft · built 1901 · class C0 · owner of record: Greenwood, Gary
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 5, 2026 | Unknown CLASS - 1 RESIDENCE CONVERTED FROM A 2 TO 4 FAMILY NFP DWELLING CONTRARY TO C-OF-O # 71690. NOTED: AT TIME OF INSPECTION ATTIC & CELLAR LEVELS OBSERVED CREATED & OCCUPIED AS CLASS 'A' APTS: EACH WITH 3 PC BTHRM; KITCHEN #39187315K | Dec 18, 2026 | $50,000 |
| May 5, 2026 | Unknown CLASS - 1 W/O A PERMIT. NOTED: AT CELLAR & ATTIC LEVELS - ELECTRICAL WIRING INSTALLED: 220V LINES FOR STOVES; 110V LINES FOR ADDL'T LIGHTS, OUTLETS, SWITCHES, BRANCH CIRCUITS., OBTAIN PERMIT #39187318X | Dec 18, 2026 | $2,500 |
| May 5, 2026 | Construction CLASS - 2 W/O A PERMIT. NOTED: AT ATTIC & CELLAR LEVELS - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A BTHRM, 2 BDRMS & CLOSETS PER FLR., OBTAIN ALL PERMITS #39187316M | Jan 15, 2027 | $1,250 |
| May 5, 2026 | Construction CLASS - 2 W/O A PERMIT. NOTED: AT ATTIC & CELLAR LEVELS - WATER & WASTE LINES INSTALLED FOR A 3 PC BTHRM (TOILET, SINK, SHOWER); RESIDENTIAL SINK AT KITCHEN AREA PER FLR., OBTAIN ALL PERMITS #39187317Y | Jan 15, 2027 | $1,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 2:13 PM ET. BBL 2027900039.