3 floors · 3,858 sq ft · built 1930 · class O5 · owner of record: 1691 Barakah Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 22, 2026 | Plumbing CLASS - 1 OBSERVED AT TIME OF INSPECTION IN GROUND-FLOOR COMMERCIAL SPACE/DELI. GAS BEING SUPPLIED TO GAS-FIRED COMMERCIAL GRILL AND FRYER. GAS OPEN AND ACTIVE. THERE ARE NO PERMITS FOR INSTALLATION OF GAS PIPING AND APP #39208945P | Jan 6, 2027 PENDING | $5,000 |
| Oct 22, 2026 | Plumbing CLASS - 2 OBSERVED AT THE TIME OF INSPECTION IN THE GROUND-FLOOR COMMERCIAL SPACE/DELI. GAS IS BEING SUPPLIED TO A GAS-FIRED COMMERCIAL GRILL AND FRYER. GAS VALVES FOR ALL APPLIANCES ARE OPEN AND ACTIVE. THERE IS NO PERM #39208950J | Jan 6, 2027 PENDING | $1,250 |
| Oct 22, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION IN THE GROUND FLOOR COMMERCIAL SPACE (DELI), AN UNAUTHORIZED, UNPERMITTED NEWLY INSTALLED FUTURE GAS PIPE CONNECTION WAS OBSERVED. PROHIBITED AS PER FGC 404.15, FAILING TO MEET ANY PER #39208940X | Jan 6, 2027 PENDING | $1,250 |
| Oct 22, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION, IN THE GROUND-FLOOR COMMERCIAL SPACE/DELI, OBSERVED NEW GAS PIPING AND A NEWLY INSTALLED COMMERCIAL GAS GRILL & FRYER. GAS IS ACTIVE. WORK IS 100% COMPLETE. NO DOB PERMITS ON FILE., O #39208939Z | Jan 6, 2027 PENDING | $1,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 16) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 22, 2026 | ECB | Plumbing: OBSERVED AT TIME OF INSPECTION IN GROUND-FLOOR COMMERCIAL SPACE/DELI. GAS BEING SUPPLIED TO GAS-FIRED COMMERCIAL GRILL AND FRYER. GAS OPEN AND ACTIVE. THERE ARE NO PERMITS FOR INSTALLATION OF GAS PIPING AND APP | Open |
| Oct 22, 2026 | ECB | Plumbing: OBSERVED AT THE TIME OF INSPECTION IN THE GROUND-FLOOR COMMERCIAL SPACE/DELI. GAS IS BEING SUPPLIED TO A GAS-FIRED COMMERCIAL GRILL AND FRYER. GAS VALVES FOR ALL APPLIANCES ARE OPEN AND ACTIVE. THERE IS NO PERM | Open |
| Oct 22, 2026 | ECB | Construction: AT THE TIME OF INSPECTION IN THE GROUND FLOOR COMMERCIAL SPACE (DELI), AN UNAUTHORIZED, UNPERMITTED NEWLY INSTALLED FUTURE GAS PIPE CONNECTION WAS OBSERVED. PROHIBITED AS PER FGC 404.15, FAILING TO MEET ANY PER | Open |
| Oct 22, 2026 | ECB | Construction: AT THE TIME OF INSPECTION, IN THE GROUND-FLOOR COMMERCIAL SPACE/DELI, OBSERVED NEW GAS PIPING AND A NEWLY INSTALLED COMMERCIAL GAS GRILL & FRYER. GAS IS ACTIVE. WORK IS 100% COMPLETE. NO DOB PERMITS ON FILE., O | Open |