1 floors · 2,278 sq ft · built 1924 · class M1 · owner of record: Mount Gilead Baptist Church
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-07-23 (Accepted). Agency page | Dec 31, 2026 in 66 days | 1 of 1 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 13, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER#08225PI201082T CONTROL#341439 DATED 08/12/25 NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN.REM:COMPLY WITH THE COMMISSIONERS ORDER. #35719072Y | Jan 30, 2026 DEFAULT | $25,000 |
| May 8, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. BUILDING IS A1 STORY PLUS BASEMENT CORNER LOT CHURCH. OBSERVED CRACKED/LOOSE AND MISSING MORTAR JOINTS AT ALL EXPOSURES OF RUBBLE WALLS. MASONRY CRACKS A #35717032K | Apr 24, 2026 IN VIOLATION | $2,500 |
| Nov 20, 2014 | Construction CLASS - 3 VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT-DEAD STORAGE OF A SILVER/GREY MINIVAN AT REAR YARD.REG.EXP 5/2012 AND FRONT TIRESARE FLAT NO LICENSE PLATES ON VEHICLE.PROPERTY IS IN AN R-8 GENERAL RE #35108510M | Jan 16, 2015 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 12, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER 348214,050825PI20401SB DATED 5/8/25 REQUIRING OWNER TO PROV A CORRECTIVE ACTION PLAN BY 6/8/25 7 START BLDG REPAIRS UNDER PERMIT BY 7/7/25 7 COMPLETED/SIGNED OFF BY 8/6/25 AS OF 8/12/25 A CAP & EVIDENCE OF COMPLETED REPR WORK WAS NOT REC'D IMMED COMPLY W/COMMISSIONER ORDER #PI20408ZT | DOB VIOLATION - ACTIVE |
| Jun 5, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#348219 & VIO#050825PI20402SB DATED 05/08/2025 REQUIRING THE OWNER TO IMMED PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC @ EXP4 & INSTALL A S/W SHED @ EXP3/4 CORNER AS OF TODAY 06/05/25 NO S/W SHED IS INSTALLED. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL #PI20401SB | DOB VIOLATION - ACTIVE |
| Jun 5, 2025 | IMMEDIATE EMERGENCY REMEDY: ERECT APPROX A TOTAL OF ABOUT 20LF OF "L" SHAPED SIDEWALK PROT ECTION AS FOLLOWS: 1. ERECT 10LFOF SIDEWALK SHEDBY CORNEROF EXPO 3/4 A LONG THE SIDEWALK OF EAST 173 STAT EXPO 4& EXTENDED THE SIDE WALK FOR FULL WIDTH OF THE ALLEY/COURTYARD ATEXPO 3 (APPROX 10 F W) W/DURABLE F ULL HEIGHT WIRE S #19271 | DOB VIOLATION - ACTIVE |
| May 8, 2025 | CONSTRUCTION CORRECTION ACTION PLAN REQ'D. OBSVD LOOSE/CRACKED & MISSING MORTAR @ ALL EXPOSURES OF THE RUBBLE FOUND. MASONRY CRACKS & DETERIORATED LINTELS OBSVD @ ALL EXPOSURES. @ EXP2,CRACKED WINDOW ON BSMT LEVEL @ EXP4 OBSVD BULGING/CRACKED MASONRY @ PARAPET LEVEL. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL #PI2041SB | DOB VIOLATION - ACTIVE |
| May 8, 2025 | CONSTRUCTION EMERGENCY WORK ORDER REQ'D. OBSVD HAZARDOUS CONDITIONS @ EXP4,CORNER OF 3/4 SUCH AS BULGING/CRACKED MASONRY @ PARAPET LEVEL IMMED PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AT EXP4 INSTALL SIDEWALK SHED ALONG EXP3/4 CORNER AS FOLLOWS:10 LINEAR FEET ALONG EXP4(OVER EGRESS DOOR)& ADD 10 LINE #PI2042SB | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05734 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #08063 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #08409 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #08336 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #08747 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #09807 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #09601 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #10534 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #09814 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 8:57 AM ET. BBL 2027940035.