9 floors · 46 apartments · 75,733 sq ft · built 1913 · class RM · owner of record: 168 Plymouth Street, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 42 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-20 (Accepted). Agency page | Dec 31, 2026 in 42 days | 3 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 58 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 75,733 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 163 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 163 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1138 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 30). Agency page | Dec 31, 2030 in 1503 days | Next due 2030 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $83,250 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-09-24) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 11, 2020 | Construction CLASS - 1 SEC. 3314.4.5.1 TRAINING FOR SUPPORTED SCAFFOLD INSPECTOR. NOTED: ON AN ACTIVE JOBSITE W/ALTERATION & ENLARGEMENT,OBSERVED A SUPPORTED PIPE SCAFFOLD OVER 40FT IN HEIGHT W/INSPECTION LOG CONDUCTED BY THE COMPETE #35497512H | Apr 21, 2021 IN VIOLATION | $2,500 |
| Dec 11, 2020 | Site Safety CLASS - 1 FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHPT 33 &ADMIN CODE & NYC FC STOP USE AT SUSPENDED SCAFFOLD & FLOORS ABOVE 75FT8FL & UP. AT THE TIME OF MY INSPECTION I OBSERVED A SIDEWALK SHED INST #35497515N | Apr 21, 2021 IN VIOLATION | $1,250 |
| Dec 11, 2020 | Construction CLASS - 1 SEC. 3303.12.2ELEVATOR/HOIST NOT IN A STATE OF READINESS. NOTED: ON ANACTIVE CONSTRUCTION SITE,OBSERVED THAT TEMP HOIST HAS BEEN DISMANTLED &CONTRACTOR WAS UTILIZING THE ELEVATOR UNDER CONSTRUCTION,UPON REQUEST #35497517R | Apr 21, 2021 IN VIOLATION | $2,500 |
| Dec 11, 2020 | Construction CLASS - 1 SEC. 3308.5 FAILURE TO MAINTAIN VERTICAL SAFETY NETTING SYSTEM AS REQUIRED. AT THE TIME OF MY INSPECTION,I OBSERVED THE VERTICAL NETTING SYSTEM AT THE ROOF AREAS WAS NOT BEING MAINTAINED AS REQUIRED. THE NETTIN #35497521J | Apr 21, 2021 IN VIOLATION | $2,500 |
| Dec 11, 2020 | Construction CLASS - 1 SEC. 3303.8 STANDPIPE SYSTEM NOT IN A STATE OF READINESS. NOTED: ON ANACTIVE JOBSITE,TOPPED OFF,OBSERVED THAT THE STANDPIPE WAS NOT PAINTED RED IN MULTIPLE LOCATIONS,THERE WAS NO GUAGE AT TOP,STANDPIPE ENDING #35497518Z | Apr 21, 2021 IN VIOLATION | $2,500 |
| Dec 11, 2020 | Construction CLASS - 1 SEC. 3301.2 FAILURE TO SAFEGUARD ALL PERSONS ON SITE IN PURSUANT TO BC3301.1.1. AT THE TIME OF MY INSPECTION,I OBSERVED LARGE HOLES IN THE SLAB AT ALL FLOORS. THERE HOLES WAS RANGED FROM 2F INCHES TO ALMOST #35497519K | Apr 21, 2021 IN VIOLATION | $2,500 |
| Dec 11, 2020 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. NOTED: ON AN ACTIVE ALTERATION,OBSERVED PIPE SCAFFOLD ON TOP OF SWS BOTH NOT CONFORMING TO DWGS,AT EXP#1 SWS & SCAFFOLD WERE ALTERED TO GO AROUND WOODEN #35497513J | Apr 21, 2021 IN VIOLATION | $2,500 |
| Jan 11, 2020 | Construction CLASS - 1 FAILURE TO INSTITUTE MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION "NO GUARD RAILS"AT TIME OF INSPECTION ON AN ALT 1 OPEN PERMIT FOR ENLARGEMENT AND CONVERSION TO R-2 RESIDENTIAL USE BUILDING.I O #35469697P | Dec 18, 2020 DEFAULT | $12,500 |
| Jan 11, 2020 | Construction CLASS - 1 BC3303.7.2 FIRE EXTINGUISHER INADEQUATE,NOT IN CONFORMANCE W/NYC FIRE CODE AT TIME OF INSPECTION ON AN OPEN PERMIT ALT1.I OBSERVED ACTIVE JOB SITE.ALSO OBSERVED IN EACH FL FIRE EXTINGUISHERS PLACED ON FLOOR NO #35469703M | Dec 18, 2020 DEFAULT | $6,250 |
| Jan 11, 2020 | Cranes and Derricks CLASS - 1 NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD PERFORMED BY AUTH ORIZED PERSON AT SITE.AT TIME OF INSPECTION ON AN ALT 1 OPEN PERMIT FOR ENLARGEMENT AND CONVERSION TO R-2 RESIDENTIAL USE BLDG.I OBSERVED AC #35469700R | Dec 18, 2020 DEFAULT | $12,500 |
| Jan 11, 2020 | Unknown CLASS - 1 FAILURE TO ENSURE EACH WORKER HAS SUCCESSFULLY COMPLETED THE REQUIRINGTRAINING AT TIME OF INSPECTION ON AN ALT1 OPEN PERMIT FOR ENLARGEMENT & CONVERSION TO R2 RESIDENTIAL BLDG.I OBSERVED ACTIVE SITE W/SUPERVISO #35469701Z | Dec 18, 2020 DEFAULT | $12,500 |
| Jan 11, 2020 | Site Safety CLASS - 1 FAILURE TO MAINTAIN DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33.AT TIME OF INSPECTION ON AN ALT 1 OPEN PERMIT FOR ENLARGEMENT AN CONVERSION TO R2 RESIDENTIAL USE BUILDING I OBSERVED ACTIVE SITE.UPON REQ #35469699Z | Dec 18, 2020 DEFAULT | $6,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 8:34 AM ET. BBL 3000307501.