3 floors · 4 apartments · 3,760 sq ft · built 1869 · class C3 · owner of record: Azcue, Henry
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 26, 2007 | Quality of Life Hazardous OCCUPANCY CONTRARY TO C OF O. DOB "C OF O" #149200 INDICATES PREMISES TO BE A 4 FAM DWELLING 1,2,3 & BASEMENT LEVEL, CELLAR ORDINARY ATTIC ORDINARY. ILLEGAL OCCUPANCY NOTED: AT ATTIC LEVEL CREATED BEDRM (BED, #34575021H | Jul 2, 2007 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 7, 2000 | CONSTRUCTION HAZARDOUS #06EM02 | DOB VIOLATION - ACTIVE |
| Apr 14, 2000 | CONSTRUCTION #02J1 | DOB VIOLATION - ACTIVE |
| Feb 10, 2000 | CONSTRUCTION WORK WITHOUT PERMIT. WORK NOTED: AT ENTIRE FACE OF BLDG LOOSE CEMENT ( CHIPS) REMOVED CREATING IRREGULAR STRUCTURE TO BE FILLED WITH A SCRATCH COAT COAT OF CEMENT & A FINISH COAT OF TEXTURED BROWNSTONE STOP ALL WORK REMEDY: OBTAIN PERMITS FOR OUTSIDE STRUCTURAL WORK #06EM02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 27, 1999 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: ADDITIONAL STORY ERECTED ON ROOF OF PREMISES. STOP ALL WORK. RENOVATION OF 1ST FLR APT. NEW BATH INSTAL LED AND PARTITIONS ERECTED INCLUDING CLOSURE OF ONE PUBLIC HALLWAY EN- TRANCE TO APT AT END OF STAIRS. REMEDY: STOP ALL WORK MAKE SITE SAFE OBTAIN ALL NECESSARY #06HS02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Oct 6, 1998 | CONSTRUCTION WORK WITHOUT A PERMIT WORK NOTED PREMISES BEING EXTYENDED FROM THRU 3 STORY TO FOUR STORY WITHOUT A PERMIT #06HS01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 12:44 PM ET. BBL 3009470052.