3 floors · 6 apartments · 5,175 sq ft · built 1931 · class C2 · owner of record: Gabriel Casasnovas, Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-30 (Accepted). Agency page | Dec 31, 2026 in 70 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #17237 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #11543 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #31941 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #10564 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #32301 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 21, 2026 | C | Apt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Aug 21, 2026 | C | Apt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 16, 2026 |
| Nov 7, 2025 | B | Apt 1L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 12, 2025 |
| Nov 7, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC FIXTURES AT CEILING AT PUBLIC HALL, 1st STORY | Dec 12, 2025 |
| Nov 7, 2025 | B | Apt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 12, 2025 |
| Sep 30, 2025 | B | Apt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 4, 2025 |
| Sep 30, 2025 | C | Apt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 26, 2025 |
| Sep 30, 2025 | B | Apt 1L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 4, 2025 |
| Sep 30, 2025 | A | Apt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 3, 2026 |
| Nov 12, 2024 | B | Apt 1L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK EAST WALL IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 1L · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 1L · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 1L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | A | Apt 1L · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER PIPE IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 15, 2025 |
| Nov 12, 2024 | C | Apt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 8, 2024 |
| Oct 16, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Nov 20, 2024 |
| Jun 21, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH , 1st STORY | Jul 5, 2024 |
| Jun 21, 2024 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING DEVICE ON BUILDING ENTRANCE DOOR , 1st STORY | Jun 27, 2024 |
| Jun 21, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE AT PUBLIC HALL, 1st STORY | Jul 5, 2024 |
| Jun 21, 2024 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING DEVICE ON VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Jun 27, 2024 |
| Aug 16, 2019 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 20, 2019 |
| Jul 3, 2019 | B | Apt 1L · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 1L · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 1L · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 1L · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 1L · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, APARTMENT AT WEST | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 1L · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, APARTMENT AT WEST | Aug 7, 2019 |
| Jul 3, 2019 | B | Apt 2R · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 2R, 2nd STORY | Aug 7, 2019 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Aug 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 9:48 AM ET. BBL 4035460073.