8 floors · 29 apartments · 21,580 sq ft · built 2019 · class D1 · owner of record: East 19th 1669 Daf Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 827 days | Filing window not open yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2019 | Construction CLASS - 1 BC3301.2/FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONSTRUCTION.NOTE:AT THE TIME OF INSPECTION OF A 8 STORY BUILDING IN PROGRESS UPON MY INSPECTION I OBSERVED ON MULTIPLE FLOORS #35418661N | Apr 27, 2020 IN VIOLATION | $2,500 |
| Sep 24, 2019 | Construction CLASS - 1 VERTICAL SAFETY NETTING SYSTEM.NOTE:AT THE TIME OF INSPECTION OF A 8 STORY BUILDING IN PROGRESS I OBSERVED INADEQUATE VERTICAL SAFETY NETTING IN PLACE(LOOSE,DAMAGED,NOT SECURED)THIS CAN CREATE A UNSAFET AND HAZ #35418660L | Apr 27, 2020 IN VIOLATION | $2,500 |
| Sep 24, 2019 | Construction CLASS - 1 BC3303.8/FAILURE TO HAVE STANDPIPE INSTALLED NOTE:AT THE TIME OF INSPECTION OF A 8 STORY BUILDING IN PROGRESS AT 8TH LEVEL UPON MY INSPECTION I OBSERVED THERE WAS NO STANDPIPE IN PLACE.THIS CAN CREATE A UNSAFE #35418659Y | Apr 27, 2020 IN VIOLATION | $2,500 |
| Sep 24, 2019 | Construction CLASS - 1 BC3316.1/NO HOIST ELEVATOR IN STATE OF READINESS NOTE:AT THE TIME OF INSPECTION OF 8 STORY BUILDING IN PROGRESS AT 8TH LEVEL UPON INSPECTIONI OBSERVED THERE WAS NO HOIST IN PLACE OF ELEVATOR.RESPONDING TO A INC #35418662P | Apr 27, 2020 IN VIOLATION | $2,500 |
| Sep 24, 2019 | Construction CLASS - 2 LOGS.NOTE:AT THE TIME OF INSPECTION OF A 8 STORY BUILDING IN PROGRESS UPON INSPECTION I OBSERVED THAT THE LOGS FOR THE JOB WERE NOT SIGNED DAILY LOG BOOK THAT WAS SHOWN WAS INADEQUATE LOGS SHOULD BE SIGNED BY T #35418655R | Apr 27, 2020 IN VIOLATION | $625 |
| Sep 24, 2019 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.NOTE:AT THE TIME OF INSPECTION OF A 8 STORY BUILDING IN PROGRESS I OBSERVED AT EXP#3OVERHEAD PROTECTION IN PLACE.THEY HAVE FAILED TO EXTEND THE PROTECTION #35418658M | Apr 27, 2020 IN VIOLATION | $2,400 |
| Sep 24, 2019 | Unknown CLASS - 1 PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRE-SHIFT SAFETY MEETINGPRIOR TO COMMENCEMENT OF WORK.NOTE:AT TIME OF INSPECTION UPON REQUEST FOR ORIENTATION/PRESHIFT SAFETY MEETING LOGS FOR WORKERS ON SITE NONE #35418656Z | Apr 27, 2020 IN VIOLATION | $2,500 |
| Sep 24, 2019 | Construction CLASS - 1 FAILURE TO PROMPLY NOTIFY THE DEPT OF AN ACCIDENT AT A CONSTRUCTION/DEMOLITION SITE. NOTE: AT THE TIME OF INSPECTION ANSWERING TO A INCIDENTTHAT OCCURED,INSPECTION REVEALS A WORKER WAS PERFORMING FORMWORK ON TH #35418654P | Apr 27, 2020 IN VIOLATION | $5,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 20, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AT VESTIBULE , 1st STORY | Jul 24, 2026 |
| Apr 20, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRERETARDANT PLASTER AT ALL WALLS. IN VESTIBULE , 1st STORY | May 25, 2026 |
| Dec 10, 2025 | B | Apt 8E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 14, 2026 |
| Dec 10, 2025 | B | Apt 8E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 14, 2026 |
| Nov 13, 2024 | C | Apt 3C · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Nov 13, 2024 |
| Nov 7, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET, 3rd STORY | Nov 21, 2024 |
| Oct 15, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR | Nov 19, 2024 |
| Sep 30, 2024 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Jan 3, 2025 |
| Mar 27, 2023 | A | § 27-2005 ADM CODE REFIT AT WINDOW IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 30, 2023 |
| Mar 27, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BLANCE AT LOWER SASH WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 1, 2023 |
| Mar 27, 2023 | A | § 27-2005 ADM CODE REFIT AT DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 30, 2023 |
| Mar 23, 2023 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Jun 26, 2023 |
| Mar 23, 2023 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Jun 26, 2023 |
| Mar 23, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM MISSING | Mar 29, 2023 |
| Mar 23, 2023 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Jun 26, 2023 |
| Mar 23, 2023 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL, 1st STORY | Jun 26, 2023 |
| Mar 23, 2023 | A | § 27-2046.1, 2046.2 HMC: MAINTAIN ON THE PREMISES AND MAKE AVAILABLE TO THE DEPARTMENT UPON REQUEST RECORDS OF INSTALLATION AND MAINTENANCE OF CARBON MONOXIDE DETECTING DEVICE(S) IN THE BUILDING. | Jun 26, 2023 |
| Mar 23, 2023 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Jun 26, 2023 |
| Mar 23, 2023 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Jun 26, 2023 |
| Jan 12, 2023 | B | Apt 8E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE KITCHEN LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 15357437 ISSUED 11-SEP-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Feb 16, 2023 |
| Sep 14, 2022 | A | Apt 8E · § 27-2005 ADM CODE REFIT WINDOW IN THE 4th ROOM FROM EAST LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 18, 2022 |
| Sep 14, 2022 | A | Apt 8E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 18, 2022 |
| Sep 14, 2022 | A | Apt 8E · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING METAL MOULDING AT PATIO DOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 18, 2022 |
| Sep 14, 2022 | A | Apt 8E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 18, 2022 |
| Sep 14, 2022 | B | Apt 8E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW HINGE IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 9:27 PM ET. BBL 3067820059.