Brooklyn · Block 1465 · Lot 20 · 11233

1668 Eastern Parkway

8 floors · 35,812 sq ft · built 2017 · class H3 · owner of record: 1815 Pacific Llc

0open violations
$17,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
70dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 70 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 122 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 35,812 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing

Open violations

ECB / OATH (3) · $17,500 owed
IssuedViolationHearingBalance
Apr 17, 2021Construction CLASS - 2
BC3314.4.8 FAILURE TO MAINTAIN PIPE SCAFFOLD AS PER CODE.AT TIME OF INSPECTION ON AN INACTIVE 8 STORY NB CONSTRUCTION SITE NOTICE AT EXPO.#1& 4 OF THE BLDG PIPE SCAFFOLD.THE SCAFFOLD ON SITE WAS NOT MAINTAIN AS
#35552856K
Aug 25, 2021
DEFAULT
$5,000
Feb 6, 2020Construction CLASS - 1
3303.12.2=HOIST NOT IN STATE OF READINESS NOTE:AT THE TIME OF MY INSPECTION OF AN 8 STORY BUILDING AT ROOF LEVEL CONSTRUCTION WORK IN PROGRESS I OBSERVED THAT THE BUILDING HAD NO HOIST IN OPERATION NEITHER THER
#35467316N
Dec 21, 2020
IN VIOLATION
$2,500
Feb 6, 2020Construction CLASS - 1
FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES AND TEMPORARY CONSTRUCTION NOTED AT TIM EOF MY INSPECTION OF AN 8 STORY BUIDLING AT ROOF LEVEL CONSTRUCTION WORK IN RPOGRESS I WAS ENCOUNTER BY THE SMELL OF EXH
#35467317P
Mar 15, 2021
IN VIOLATION
$10,000
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 6:40 PM ET. BBL 3014650020.

Look up another building