Queens · Block 3553 · Lot 70 · 11385

1665 Norman Street

3 floors · 1 apartments · 5,400 sq ft · built 1931 · class K4 · owner of record: Treble Properties, Llc

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1160dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 308 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1160 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Jun 13, 2016Boilers CLASS - 2
B265 AS PER CLASS 2 (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT B09 REPORT. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT THE CERTIFICATE OF CORRECT
#32076966H
Aug 2, 2016
IN VIOLATION
$0
Feb 12, 2009Unknown CLASS - 2
SEC 28-104.7.7 & 27-155 & 27-162 FAILURE TO FILE TR1 FORM & DESIGNATE OPERATIONS SUBJECT TO CONTROLLED INSP SPECIAL INSP ON PLANS PRIOR TO THE COMMENCEMENT OF WORK UNDER CONTROLLED INPS SPECIAL INSP OBSERVED AT
#34766102L
Oct 20, 2009
IN VIOLATION
$0
Nov 16, 2005Boilers Non-Hazardous
46C/50A/50B/50C/50D/50E/50F/48B. 1997 FULTON N.B. #33431(S). 50A- REPAIR STEAM LEAK BY GAUGE. 50B-PROPERLY SUPPORT FLUE PIPE. 50C- REVERSE THE VALVE ON THE BOTTOM BLOWDOWN LINE SO THAT THE BALL VALVE IS CLOSE T
#32048949H
Jul 25, 2006
WRITTEN OFF
$0
DOB (1)
IssuedViolationStatus
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL 2016 BOILER INSPECTION
#15160
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL 2016 BOILER INSPECTION
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 11:54 AM ET. BBL 4035530070.

Look up another building