3 floors · 1 apartments · 5,400 sq ft · built 1931 · class K4 · owner of record: Treble Properties, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 13, 2016 | Boilers CLASS - 2 B265 AS PER CLASS 2 (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT B09 REPORT. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT THE CERTIFICATE OF CORRECT #32076966H | Aug 2, 2016 IN VIOLATION | $0 |
| Feb 12, 2009 | Unknown CLASS - 2 SEC 28-104.7.7 & 27-155 & 27-162 FAILURE TO FILE TR1 FORM & DESIGNATE OPERATIONS SUBJECT TO CONTROLLED INSP SPECIAL INSP ON PLANS PRIOR TO THE COMMENCEMENT OF WORK UNDER CONTROLLED INPS SPECIAL INSP OBSERVED AT #34766102L | Oct 20, 2009 IN VIOLATION | $0 |
| Nov 16, 2005 | Boilers Non-Hazardous 46C/50A/50B/50C/50D/50E/50F/48B. 1997 FULTON N.B. #33431(S). 50A- REPAIR STEAM LEAK BY GAUGE. 50B-PROPERLY SUPPORT FLUE PIPE. 50C- REVERSE THE VALVE ON THE BOTTOM BLOWDOWN LINE SO THAT THE BALL VALVE IS CLOSE T #32048949H | Jul 25, 2006 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL 2016 BOILER INSPECTION #15160 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL 2016 BOILER INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 11:54 AM ET. BBL 4035530070.