6 floors · 67 apartments · 75,978 sq ft · built 1926 · class D1 · owner of record: Parkview - Crotona Park Housing Developm Ent Fund C
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-29 (Accepted). Agency page | Dec 31, 2026 in 44 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 75,978 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2940). Agency page | Dec 31, 2030 in 1505 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Elevators CLASS - 1 FAILURE TO MAINTAIN THE ELEVATOR IN BUILDINGS CODE COMPLIANT AS PER BC3001.2 & 27-987 UPON AN INSPECTION THE DOOR RESTRICTOR HAS BEEN TAMPERED WITH/DISABLE AND RENDERED INOPERATIVE. THIS A SAFETY DEVICE TO ENSU #39204975H | Dec 4, 2026 | $1,250 |
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #807933. AGG1: PRIOR NOV 37026586M UNDER 28-302 #37036583X | Jan 15, 2027 PENDING | $3,125 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #907933. REMEDY: SUBMIT ACCEPTABLE REQU #37027956P | Aug 23, 2024 ADMIT/IN-VIO | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#807933.REM:FILE ACCEPTABLE REPORT. #37026586M | May 3, 2024 DEFAULT | $0 |
| Mar 6, 2023 | Construction CLASS - 2 REMOVAL OF SIDEWALK SHED AND OTHER SAFETY MEASURES WITHOUT DEPT APPROVAL.AT THE TIME OF INSPECTION,THE BUILDING FACADES WERE STILL DESIGNATED AS UNSAFE.THE AMENDED TECHNICAL REPORT RECEIVED FROM PE/RA ON 2/21/2 #35670546M | Nov 13, 2023 IN VIOLATION | $0 |
| Oct 21, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTNEANCES.AS NOTED:AT TIME OF INSPECTION I OBSERVED ON EXPOSURE#1 CROTONA PARK EAST ELEVATION-CRACKED SPALLING TERRA COTTA AT PERAPET WALL.CRACKED SPALLING TE #35365689Z | Feb 14, 2020 IN VIOLATION | $0 |
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPROT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #807933. RMDY: SUBMIT REQUIRED TECHNICAL REPORT. #37013441Z | May 3, 2019 IN VIOLATION | $0 |
| Aug 11, 2015 | Boilers CLASS - 2 B254,11C,32A,50,50A,50B,50C,50D,50E,50F,50G,50H. 50-BOILER ROOM FRESH AIR FAN AND SAIL SWITCH,NOT INTERLOCKED W/OPERATION OF HOT WATER HEATER; 50A-GAS PILOT REGULATOR MISSING VENT LIMITER; 50B-COLD WATER PIPES #32075594L | Jan 8, 2016 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01281 | DOB VIOLATION - ACTIVE |
| Jun 13, 2019 | FACADE SAFETY PROGRAM #HAZ88575 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Jun 13, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 22, 2026 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM PAPER SIGN AT PUBLIC HALL, 1st STORY | Jun 28, 2026 |
| Jun 22, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Sep 25, 2026 |
| Jun 22, 2026 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS PAPER SIGN | Sep 25, 2026 |
| May 28, 2026 | B | Apt 4E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND BUZZER RETURN SYSTEM FROM BUILDING ENTRANCE TO WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jul 2, 2026 |
| May 21, 2026 | C | Apt 4E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Jun 16, 2026 |
| May 21, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HOPPER/COMPACTOR (HINGE) AT EAST WALL AT COMPACTOR CLOSET AT EAST , 5th STORY | Jun 4, 2026 |
| May 21, 2026 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''North'' | Jun 16, 2026 |
| May 21, 2026 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''North'' | Jun 16, 2026 |
| May 20, 2026 | C | Apt 1J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 15, 2026 |
| Apr 25, 2024 | C | Apt 5G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | May 21, 2024 |
| Apr 25, 2024 | A | Apt 3J · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZER INTERCOM SYSTEM LEADING FROM COURT ENTEANCE TO WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 29, 2024 |
| Apr 25, 2024 | C | Apt 5G · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APAR | May 21, 2024 |
| Apr 25, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HOPPER DOOR AT SOUTH WALL AT PUBLIC HALL, 5th STORY | May 9, 2024 |
| Apr 1, 2024 | A | Apt 3D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL RETURN BUZZER FROM STREET ENTRANCE TO THE WEST WALL. IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 5th APARTMENT FROM WEST AT NORTH | Jul 5, 2024 |
| Mar 25, 2024 | A | Apt 3C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO BOX AT SOUTH WALL IN THE FOYER LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 28, 2024 |
| Mar 14, 2024 | B | Apt 5A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VOICE RETURN INTERCOM BUZZER SYSTEM IN THE FOYER LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 18, 2024 |
| Mar 12, 2024 | C | Apt 5G · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APAR | Apr 7, 2024 |
| Mar 4, 2024 | A | Apt 4K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT WEST WALL IN THE FOYER LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 7, 2024 |
| Dec 15, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 1st STORY | Jan 19, 2024 |
| Dec 14, 2023 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/ BUZZER FROM THE BUILDING ENTRANCE TO THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jan 18, 2024 |
| Aug 18, 2023 | B | Apt 3F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE APARTMENT WALL PANEL. LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 22, 2023 |
| Aug 18, 2023 | B | Apt 5A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BUZZER SYSTEM FROM BUILDING ENTRANCE DOOR TO APT 5A IN THE ENTRANCE LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST | Sep 22, 2023 |
| Jun 5, 2023 | B | Apt 6F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Jul 10, 2023 |
| Jun 5, 2023 | B | Apt 6F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Jul 10, 2023 |
| Jun 5, 2023 | B | Apt 6F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT ROOM DOOR LEADING TO FIRE ESCAPE WINDOW. IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Jul 10, 2023 |
| Mar 17, 2023 | A | Apt 4H · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM AT SOUTH WALL IN THE FOYER LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 20, 2023 |
| Aug 26, 2022 | A | Apt 6G · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE FOYER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Nov 29, 2022 |
| Apr 21, 2022 | B | Apt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 12 SQ FT; AT EAST WALL 3 SQ FT AND WEST WALL APPROX 3 SQ FT IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | May 26, 2022 |
| Sep 20, 2019 | C | Apt 5G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 11, 2019 |
| Oct 4, 2018 | B | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HOPPER DOOR AT PUBLIC HALL, 5th STORY | Nov 8, 2018 |
| Nov 23, 2016 | B | Apt 5G · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 28, 2016 |
| Sep 5, 1989 | C | Apt 1K · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT NORTH & SOUTH WALLS PRIVATE HALL 1 STY EAST AT SOUTH APT 1K MR WALKER ER1. , SECTION '' '' | Sep 25, 1989 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | ECB | Elevators: FAILURE TO MAINTAIN THE ELEVATOR IN BUILDINGS CODE COMPLIANT AS PER BC3001.2 & 27-987 UPON AN INSPECTION THE DOOR RESTRICTOR HAS BEEN TAMPERED WITH/DISABLE AND RENDERED INOPERATIVE. THIS A SAFETY DEVICE TO ENSU | Closed |
| Aug 5, 2026 | ECB | Construction: FAILURE TO MAINTAIN BLDG EXTERIO FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED AT EXP #3 SOUTH A CRACKED/BROKEN WINDOW PANE AT BASEMENT LEVEL, WITH FRAGMENTS OF GLASS. REMEDY: MAINTAIN BLDG E | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 4:40 PM ET. BBL 2029400001.