2.5 floors · 2 apartments · 2,648 sq ft · built 1910 · class B2 · owner of record: Marcos Alber
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Required only if the owner doesn't live there |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 21, 2023 | CONSTRUCTION BOILER MODEL-LAARS JVT075NDIS AND GAS HOT WATER HEATER MODEL-AMERICAN STANDARD-GR40L-1-3-12. CEASE USE DUE TO OPEN CHIMNEY AND DISCONNECTED FLUE PIPE #23-02651 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 28, 2022 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Dec 15, 2022 | C | Apt 1STFLO · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jan 8, 2023 |
| Dec 14, 2022 | C | Apt 1STFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st | Jan 7, 2023 |
| Dec 14, 2022 | C | Apt 1STFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 1STFLO, 1st STORY, 1st AP | Jan 7, 2023 |
| Dec 14, 2022 | C | Apt 1STFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) EAS | Jan 7, 2023 |
| Dec 14, 2022 | C | Apt 1STFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL IN THE 6th ROOM FROM NORTH LOCATED AT APT 1STFLO, 1st | Jan 7, 2023 |
| Dec 14, 2022 | C | Apt 1STFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 1STFLO, 1st STORY, 1st AP | Jan 7, 2023 |
| Dec 14, 2022 | A | Apt 1STFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 19, 2023 |
| Dec 14, 2022 | A | Apt 1STFLO · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 19, 2023 |
| Dec 14, 2022 | A | Apt 1STFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 6th ROOM FROM NORTH LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 19, 2023 |
| Dec 14, 2022 | A | Apt 1STFLO · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 2nd ROOM FROM NORTH, THE KITCHEN LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 19, 2023 |
| Dec 13, 2022 | C | Apt 1STFLO · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 19, 2022 |
| Dec 13, 2022 | C | Apt 1STFLO · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 10, 2022 |
| Dec 13, 2022 | B | Apt 1STFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 17, 2023 |
| Dec 13, 2022 | C | Apt 1STFLO · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 10, 2022 |
| Dec 12, 2022 | B | Apt 1STFLO · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSE WIRES AT CEILING IN THE KITCHEN LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 16, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 8:29 AM ET. BBL 5010960026.