Manhattan · Block 1143 · Lot 60 · 10023

166 West 72 Street

12 floors · 48 apartments · 59,210 sq ft · built 1911 · class D6 · owner of record: 166 West 72nd Street

17open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
57dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 57 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-05-02 (Accepted). Agency page

Dec 31, 2026
in 57 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 73 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 59,210 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 178 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 178 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 301 days
Registered through 2027-09-01
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $242,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 840 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1153 days
Next cycle year 2029
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1143). Agency page

Dec 31, 2033
in 2614 days
Next due 2033

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Feb 18, 2026Construction CLASS - 1
FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION #35671176Z ISSUED ON 08/21/2023 FOR WORK WITHOUT PERMIT., COMPLY WITH COMMISSIONER'S ORDER
#39177642Z
Apr 30, 2026
ADMIT/IN-VIO
$0
Apr 8, 2025Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #903522. REMEDY: SUBMIT ACCEPTABLE REQU
#37034603P
Jul 3, 2025
IN VIOLATION
$0
Aug 21, 2023Construction CLASS - 1
WORK WITHOUT APERMIT. OBSERVED AT ABOVE PREMISES ON THE ROOF AND PENTHOUSE C ON A VERTICAL EXTENTION APPROX. 40% AT ROOF AREA AN ENCLOSURE WITH ROLL WINDOWS AND A DOOR. A PENETRATION TO APT. PHC THROUGH THE ROO
#35671176Z
Oct 26, 2023
IN VIOLATION
$0
DOB (9)
IssuedViolationStatus
Apr 7, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLED/SPALLING STONE WORK ON EXPOSURE 1 CRACKED DECORATIVE STONEWORK ON EXPOSURE 1. ALSO DAMAGED/MISSING MORTAR JOINTS/BRICK WORK ON EXPOSURE 4 WEST ELEVATION. REMEDY: REPAIR AND OR REPLACE
#SR10701XN
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00219
DOB VIOLATION - ACTIVE
Nov 22, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00028
DOB VIOLATION - ACTIVE
Nov 20, 2023LANDMARK

#24-0443
DOB VIOLATION - ACTIVE
Sep 11, 2023LANDMARK

#24-0191
DOB VIOLATION - ACTIVE
Jan 25, 2012FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00076
DOB VIOLATION - ACTIVE
Sep 15, 2005CONSTRUCTION

#0701LS
DOB VIOLATION - ACTIVE
Nov 25, 1998ELECTRIC SIGNS

#07A04
DOB VIOLATION - ACTIVE
Mar 29, 1991CONSTRUCTION

#D1LB01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Nov 22, 2023AEUHAZ FTC-AEU-HAZ
Active
Apr 30, 2019Facades FISPNRF
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Active
Jan 25, 2012AEUHAZ FTC-AEU-HAZ
Active
HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
Feb 19, 2020BApt 8C · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8C, 8th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 25, 2020

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 4, 2026, 11:39 AM ET. BBL 1011430060.