6 floors · 55 apartments · 65,640 sq ft · built 1938 · class D4 · owner of record: Windsor Terrace Apts.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 65,640 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5268). Agency page | Dec 31, 2028 in 794 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-12 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITION DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #910017. REMEDY: FILE ACCEPTABLE REPORT. #37036901M | Jun 28, 2027 DEFAULT | $1,280 |
| Feb 23, 2024 | Construction CLASS - 1 FAILURE TO TAKE ADEQUATE REQUIRED MEASURES TO SECURE PUBLIC SAFETY FROM UNSAFE FACADE.AS NOTED:AT THE TIME OF INSPECTION,BUILDING ONLY HAD PARTIAL SIDEWALK SHED OVER THE MAIN ENTRANCE AND OVER ENTRANCE TO EXPOS #35682176M | Sep 23, 2024 IN VIOLATION | $0 |
| Feb 16, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES.AT TIME OF INSPECTION,OBSERVED SPALLED BRICKS,DAMAGED WINDOWSILLS.SPALLED MORTAR JOINTSDEFECTED MASONRY WORKS MULTI-LOCATIONS AT EXPOSURE 1,2,3,4 NORTH,EAST #35682129J | Oct 7, 2024 IN VIOLATION | $0 |
| Nov 29, 2023 | Construction CLASS - 1 UNLAWFUL ACTS, FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: RESPONDENT FAILURE TO COMPLY WITH PRIOR VIOLATION #35675238N DATED (10/17/2023); AT TIME OF INSPECTION OBSERVED DAMAGED MORTAR JOINTS. SPALLED B #35675373X | Jun 18, 2024 IN VIOLATION | $0 |
| Oct 17, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AS THE TIME OF INSPECTION OBSERVED AT EXP#1 (NORTH ELEVATION) SPALLED/CRACK BRICKS WITH OPEN MORTAR JOINT AND DAMAGED WINDOW SILLS AT SEVERA #35675238N | May 17, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 26, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00107 | DOB VIOLATION - ACTIVE |
| Feb 21, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911700 | DOB VIOLATION - ACTIVE |
| Jan 10, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00163 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00272 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #39051 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 26, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 21, 2024 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Jan 10, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 4:00 PM ET. BBL 3052680002.