3 floors · 14,400 sq ft · built 1946 · class K4 · owner of record: Jvaa Realty Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-11 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2010 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR ALTII JOB#401745037 10/24/03 PERMIT EXPIRED 3/30/04 NOTED AT 1ST FL INTERIOR RETAIL STORE SPACE HAS BEEN ENLARGED BY THE R #34849501M | Sep 28, 2010 STIPULATION/IN-VIO | $0 |
| Jan 23, 2008 | Construction Hazardous OCCUPANCY IS CONTRARY TO THE ALLOWED BY C OF O# 039751. NOTE: CELLAR CALLS FOR NON-COMBUSTIBLE STORAGE CURRENT USE THROUGHOUT 3 STORIES IS COMBUSTIBLE (MATRAINS) IN OCCUPANCY. REMEDY: CORRECT OCCUPANCY AS PER C #34628271R | Apr 22, 2008 IN VIOLATION | $0 |
| Sep 29, 2007 | Construction Non-Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O, Q39751. NOTE: CELLARCALLS FOR NON-CONBUSTIBLE STORAGE. CURRENT USE THRUOUT ALL 3 STORIES OF BUILDING IS COMBUSTIBLE OCC. CLASS "C" MERCANTILE FOR MORE THAN THE #34609862P | Nov 27, 2007 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #16754 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #17100 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #18488 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #22370 | DOB VIOLATION - ACTIVE |
| Oct 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST #02551 | DOB VIOLATION - ACTIVE |
| May 30, 2014 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST #06650 | DOB VIOLATION - ACTIVE |
| Aug 15, 2012 | ELEVATOR #ACC101306 | DOB VIOLATION - ACTIVE |
| Oct 8, 2010 | ELEVATOR ANNUAL INSPECTION / TEST #05529 | DOB VIOLATION - ACTIVE |
| Oct 1, 2005 | LOCAL LAW 10/81 - ELEVATOR #04536 | DOB VIOLATION - ACTIVE |
| Nov 19, 2004 | LOCAL LAW 10/81 - ELEVATOR #03315 | DOB VIOLATION - ACTIVE |
| Apr 21, 2004 | LOCAL LAW 10/81 - ELEVATOR #03673 | DOB VIOLATION - ACTIVE |
| Mar 21, 2003 | LOCAL LAW 10/81 - ELEVATOR #03009 | DOB VIOLATION - ACTIVE |
| Feb 19, 2002 | LOCAL LAW 10/81 - ELEVATOR #03637 | DOB VIOLATION - ACTIVE |
| Jun 27, 2001 | ZONING #MTF03RNS | DOB VIOLATION - ACTIVE |
| Jun 27, 2001 | ZONING #16RNS | DOB VIOLATION - ACTIVE |
| Mar 8, 2001 | LOCAL LAW 10/81 - ELEVATOR #03125 | DOB VIOLATION - ACTIVE |
| Mar 10, 2000 | LOCAL LAW 10/81 - ELEVATOR #03374 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #04052 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Oct 31, 2014 | Elevators EVCAT1 | Active |
| May 30, 2014 | Elevators ACC1 | Active |
| Aug 15, 2012 | Elevators E | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
| Oct 1, 2005 | Elevators LL1081 | Active |
| Nov 19, 2004 | Elevators LL1081 | Active |
| Apr 21, 2004 | Elevators LL1081 | Active |
| Mar 21, 2003 | Elevators LL1081 | Active |
| Feb 19, 2002 | Elevators LL1081 | Active |
| Mar 8, 2001 | Elevators LL1081 | Active |
| Mar 10, 2000 | Elevators LL1081 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:34 PM ET. BBL 4097960019.