3 floors · 50,800 sq ft · built 1928 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 50,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 12341). Agency page | Dec 31, 2031 in 1889 days | Next due 2031 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:INSTALLATION OFILLEGAL HARDWARE KICK STOPS ON FIRE RATED CLASSROOM DOORS SMOKE DOORS #35732057M | Jul 15, 2026 POP/IN-VIO | $0 |
| May 28, 2026 | Construction CLASS - 2 REISSUE ON ECB#35724682H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:MISSING AND OR CRACKED WIRE MESH GLASS PANELS IN STAIR WELLS OR VISION PANELS IN STAIR I FROM 3RD TO 2ND FL AND TO 1ST FL IN #35732054R | Jul 15, 2026 POP/IN-VIO | $0 |
| May 28, 2026 | Construction CLASS - 2 REISSUE ON ECB#35724679R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED EXIT DISCHARGES AND EX #35732056K | Jul 15, 2026 POP/IN-VIO | $0 |
| May 8, 2026 | Construction CLASS - 2 REISSUE ON ECB#35724680Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:NOTED:FIRE RATED CLASSROOM AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINDING MISSING HARDWARE ON CLASSROOMS,326-2 DOORS 321,320,317,3 #35732055Z | Jul 15, 2026 POP/IN-VIO | $0 |
| Sep 25, 2025 | Construction CLASS - 2 RE-ISSUE #35677482Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-381. NOTED: AT GYM, 2 EMERGENCY LIGHTS FOUND INOPERATION #35724679R | Oct 22, 2025 POP/IN-VIO | $0 |
| Sep 25, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORSMOKE DOORS DO NOT SELF-CLOSE. 3RD FLR-"MAIN GYM ENTRANCE, 2ND FLR-"STAIR E", "STAIR C", STAIR J". 1ST FLR"-"STAIR C". CLASSROOM DOORS DO NO #35724680Y | Oct 22, 2025 POP/IN-VIO | $0 |
| Sep 25, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: IN "STAIRCASE F" BETWEEM 3RD AND 2ND FLOOR THERE IS GLASS PANEL MISSING. 2ND FLR-RM #223. ALSO HAS GLASS PANEL MISSING ON ENTRANCE DOOR. REMEDY: REP #35724682H | Oct 22, 2025 POP/IN-VIO | $0 |
| Jun 28, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIORS PER BC 1006.1; 27-381. NOTED: AT GYM, 2 EMERGENCY EXIT LIGHTING FOUND INOPERATIONAL WHEN TESTED #35677482Y | Sep 27, 2024 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 12:34 AM ET. BBL 4123410031.