6 floors · 50 apartments · 44,000 sq ft · built 1940 · class D1 · owner of record: Jomir Monroe Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 44,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 15, 2026 | Elevators CLASS - 1 REPAIR CAR DOOR TO PREVENT SCRAPING ON CLOSING FROM RETURN POST. REPAIR 6TH FLOOR CAR STATION BUTTON. REPAIR 6TH FLOOR HALL STATION BUTTON. ADJUST FLOOR LEVEL STOPS. REPAIR PHONE LINE. #39174145Y | Apr 17, 2026 IN VIOLATION | $1,250 |
| Aug 12, 2025 | Elevators CLASS - 1 CLASS 1 (CU):FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION,FUSE ON ELEVATOR CONTROL PANEL IS FOUND TO JUMPED OUT,REMOVE JUMPER AND R #39156818K | Nov 17, 2026 | $1,250 |
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #907757. REMEDY: SUBMIT ACCEPTABLE REQU #37034752Z | Jul 18, 2025 IN VIOLATION | $0 |
| Jun 20, 2024 | Elevators CLASS - 1 RESPONDING TO A 311 ELEVATOR COMPLAINT, UPON INSPECTION OF A SINGLE DEVICE IN A BUILDING, CEASE USE VIOLATION ISSUED FOR. ALTERED CAR DOOR RESTRICTOR MAKE IT NOT TO WORK, REMEDY; REPAIR THEN CONTACT NYCDB FOR A #39117298Y | Aug 30, 2024 IN VIOLATION | $1,250 |
| Oct 18, 2022 | Elevators CLASS - 2 CLASS 2 VIOLATION ISSUED, 1) PARTS ON ELEVATOR CONTROLLER UNSECURED, REMEDY , SECURE PARTS TO CONTROLLER, 2) IN CAR FAN NOT WORKING, REMEDY; REPAIR, 3) ELEVATOR MOTOR OIL LEAK, REMEDY; RE-SEAL 4) TRACTION SHEAV #39072205J | Jun 29, 2026 IN VIOLATION | $625 |
| Aug 2, 2022 | Elevators CLASS - 1 CLASS 1 VIOLATION ISSUED.UPON INSPECTION DEVICE FOUND TO BE OUT OF SERVICE AS PER 1RCNY 11-02.REMEDY:RESTORE TO SERVICE IMMEDIATELY AND NOTIFY NYCDOB THE DEVICE HAS BEEN RETURNED TO SERVICE.EMAIL EIR@BUILDINGS. #39067521P | Jun 29, 2026 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Aug 21, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00062 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01080 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #10640 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #31065 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #31258 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #09289 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #07905 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Aug 12, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 21, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 5, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Jan 8, 2027 |
| Aug 14, 2026 | C | Apt 1B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTME | Sep 7, 2026 |
| Aug 14, 2026 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY FROM EAST, THE KITCHEN , THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2026 |
| Aug 14, 2026 | B | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL, EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 18, 2026 |
| Aug 14, 2026 | A | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH IN BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2026 |
| Aug 14, 2026 | A | Apt 1B · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT TILED/GROUTED SURFACES AT NORTH WALL, EAST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2026 |
| Aug 14, 2026 | A | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2026 |
| Aug 14, 2026 | C | Apt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 9, 2026 |
| Aug 14, 2026 | B | Apt 1B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 18, 2026 |
| Aug 14, 2026 | A | Apt 1B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL AND AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2026 |
| Sep 17, 2025 | C | Apt 3D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Oct 13, 2025 |
| Sep 17, 2025 | A | Apt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WINDOW FRAME IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Dec 21, 2025 |
| Sep 17, 2025 | C | Apt 2G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Sep 23, 2025 |
| Sep 17, 2025 | A | Apt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Dec 21, 2025 |
| Sep 17, 2025 | C | Apt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 23, 2025 |
| Mar 13, 2025 | B | Apt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT EAST WALL IN THE FOYER LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 17, 2025 |
| Mar 13, 2025 | B | Apt 6A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZED FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 17, 2025 |
| Jan 15, 2025 | C | Apt 1C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 21, 2025 |
| Jan 15, 2025 | C | Apt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Feb 10, 2025 |
| Jan 15, 2025 | C | Apt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Feb 10, 2025 |
| Jan 15, 2025 | C | Apt 1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 21, 2025 |
| Oct 11, 2024 | B | Apt 1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''North'' | Nov 15, 2024 |
| Oct 11, 2024 | B | Apt 1C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''North'' | Nov 15, 2024 |
| Oct 11, 2024 | B | Apt 1C · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''North'' | Nov 15, 2024 |
| Oct 11, 2024 | B | Apt 1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''North'' | Nov 15, 2024 |
| Oct 11, 2024 | B | Apt 1C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTED WOOD FLOOR PANEL AT SINK IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''North'' | Nov 15, 2024 |
| Aug 12, 2024 | C | Apt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1654'', 1st FROM EAST AT SOUTH | Sep 7, 2024 |
| Jun 7, 2024 | B | Apt 4F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 12, 2024 |
| Jun 7, 2024 | B | Apt 4F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 12, 2024 |
| Jun 6, 2024 | B | Apt 4F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 11, 2024 |
| Jun 6, 2024 | B | Apt 4F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 11, 2024 |
| Jun 6, 2024 | B | Apt 4F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 11, 2024 |
| Apr 29, 2024 | B | Apt 5D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16551384 ISSUED 28-DEC-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b) | Jun 3, 2024 |
| Apr 29, 2024 | B | Apt 5D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL APPROXIMATELY 7SQFT IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16551387 ISSUED 28-DEC-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE | Jun 3, 2024 |
| Jan 15, 2024 | C | Apt 1B · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH | Feb 8, 2024 |
| Jan 8, 2024 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 3, 2024 |
| Jan 8, 2024 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 3, 2024 |
| Jan 2, 2024 | A | Apt 6A · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION [STUD AND SHEETROCK WALL ERECTED FROM FLOOR TO CEILING SUBDIVIDING ROOM ] IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, | Apr 6, 2024 |
| Dec 29, 2023 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Feb 2, 2024 |
| Dec 29, 2023 | B | Apt 5D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Feb 2, 2024 |
| Dec 29, 2023 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Feb 2, 2024 |
| Sep 25, 2023 | B | Apt 5D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 4 SQ FT IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16010757 ISSUED 24-MAY-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a( | Oct 30, 2023 |
| May 26, 2023 | A | Apt 5D · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 29, 2023 |
| Apr 19, 2023 | B | Apt 3D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTICAL OUTLET AT WEST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | May 24, 2023 |
| Apr 19, 2023 | B | Apt 3D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | May 24, 2023 |
| Apr 5, 2023 | C | Apt APT1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT APT1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | May 1, 2023 |
| Feb 16, 2023 | B | Apt 1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 23, 2023 |
| Oct 19, 2022 | C | Apt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 14, 2022 |
| Nov 8, 2021 | B | Apt 4F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES FLOOR IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 13, 2021 |
| Nov 8, 2021 | B | Apt 4F · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD DOOR AT ENTRANCE IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 13, 2021 |
| Nov 8, 2021 | C | Apt 5E · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING SLIDE BOLT WITH EYE CAPABLE OF BEING PADLOCKED INSTALLED AT DOOR IN THE ENTRANCE LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 14, 2021 |
| Sep 10, 2021 | B | Apt 1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, SOUTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 15, 2021 |
| Sep 10, 2021 | B | Apt 1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 15, 2021 |
| Sep 24, 2018 | A | Apt 4E · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL CREATING ROOMS IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4E, 4th STORY | Dec 28, 2018 |
| Sep 13, 2006 | A | Apt 1E · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SHEETROCK AND STUDS ERECTED FROM FLOOR TO CEILING CREATING AN ADDITIONAL ROOM AT IN THE 2nd ROOM FROM EAST LOCATED AT APT 1E, 1st STORY, 1s | Dec 22, 2006 |
| Oct 31, 1995 | C | Apt 5D · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WALLS 5TH STY NORTHWEST APT 5D KITCHEN MS TURBI 583 8738 ER. , SECTION '' '' | Nov 20, 1995 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 5, 2026 | HPD A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Open |
| Aug 14, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTME | Open |
| Aug 14, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY FROM EAST, THE KITCHEN , THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 14, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL, EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 14, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH IN BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 14, 2026 | HPD A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT TILED/GROUTED SURFACES AT NORTH WALL, EAST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 14, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 14, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 14, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 14, 2026 | HPD A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL AND AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 12, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 6:02 PM ET. BBL 2027910005.