Manhattan · Block 2221 · Lot 11 · 10034

165 Sherman Avenue

6 floors · 100 apartments · 93,250 sq ft · built 1925 · class D7 · owner of record: 165 Sherman Associates Llc

51open violations
$0ECB/OATH penalties owed
10HPD class C (immediately hazardous)
50dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-31 (Accepted). Agency page

Dec 31, 2026
in 50 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 93,250 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 415 days
Next cycle year 2027
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2221). Agency page

Dec 31, 2031
in 1876 days
Next due 2031

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Aug 1, 2002ELEVATOR
1P20125
#9011/159967
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (50) · C 10 · B 34 · A 6
IssuedClassViolationCorrect by
Oct 1, 2026BApt 1N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTNov 5, 2026
Oct 1, 2026AApt 1N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT DOOR, AT REFRIGERATOR IN THE KITCHEN LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTJan 4, 2027
Oct 1, 2026AApt 1N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTJan 4, 2027
Oct 1, 2026AApt 1N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL, AND AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTJan 4, 2027
Sep 14, 2026AApt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE KITCHEN , THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 18, 2026
Sep 14, 2026CApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 20, 2026
Jun 9, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT VESTIBULE CEILING.Sep 12, 2026
May 29, 2024BApt 4F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''Jul 3, 2024
May 29, 2024BApt 5O · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5O, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''Jul 3, 2024
May 29, 2024BApt 5J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5J, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''Jul 3, 2024
May 29, 2024BApt 5F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''Jul 3, 2024
May 29, 2024BApt 1N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''Jul 3, 2024
May 29, 2024BApt 6D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''Jul 3, 2024
May 29, 2024BApt 2I · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''Jul 3, 2024
May 29, 2024BApt 3P · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION ''Jul 3, 2024
May 29, 2024BApt 6J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''Jul 3, 2024
May 21, 2024BApt 1C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 4I · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4I, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''Jun 25, 2024
May 21, 2024BApt 3A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 2R · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2R, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 2P · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2P, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 2J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''Jun 25, 2024
May 21, 2024BApt 1Q · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1Q, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''Jun 25, 2024
May 21, 2024BApt 6P · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6P, 6th STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 5B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''Jun 25, 2024
May 21, 2024BApt 2H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 6O · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6O, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''Jun 25, 2024
May 21, 2024BApt 5L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 21, 2024BApt 4N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''Jun 25, 2024
May 21, 2024BApt 3K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''Jun 25, 2024
May 20, 2024C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.May 24, 2024
May 20, 2024C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.May 24, 2024
May 10, 2024BApt 4A · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOORS AT SINK CABINET IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , 3rd SECTION FROM NORTH AT EASTJun 14, 2024
Sep 18, 2023BApt 3L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''Oct 23, 2023
Jul 26, 2023BApt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER GASKET SEAL AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTHWEST''Aug 30, 2023
Jul 26, 2023CApt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTHWEST''Aug 21, 2023
May 22, 2023AApt 4R · § 27-2026 ADM CODE REPLACE WITH NEW THE DEFECTIVE FLUSH PIPE OF WATER CLOSET IN THE BATHROOM LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTHEAST''Aug 25, 2023
Mar 17, 2023CApt 2B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NORApr 10, 2023
Jul 28, 2022BApt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL ( APPROX 20 SQ FT ) IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''Sep 1, 2022
Jun 30, 2022BApt 4D · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET SEAL AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST AT NORTHAug 4, 2022
Mar 23, 2022CApt 4Q · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AApr 16, 2022
Mar 15, 2022CApt 4Q · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 10 SQ. FT. AT THE CEILING IN THE BATHROOM LOCATED AT APT 4Q, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 14361232 ISSUED 27-MAY-21 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE §27-Apr 10, 2022
Sep 10, 2021CApt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 6, 2021
Oct 26, 2020BApt 2K · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOUSEHOLD ITEMS OBSTRUCTING EGRESS TO FIRE ESCAPE EXIT DOOR IN THE 5th ROOM FROM NORTH LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WESTNov 30, 2020
Oct 16, 2020CApt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 11, 2020
Jun 15, 2020BApt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 18 SQ. FT IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 20, 2020
Aug 26, 2019BApt 1A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL (18 SQ FT ) IN THE 1st ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTHSep 30, 2019
Aug 21, 2018BApt 5M · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING APPROX 10 SQUARE FEET IN THE 1st ROOM FROM EAST LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM WEST AT NORTHSep 25, 2018
Apr 1, 2011C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF UNCAPPED RADIATOR SHUT-OFF VALVE AT PUBLIC HALL, 2nd STORY, SECTION AT WESTApr 7, 2011

Issued in the last 120 days

DateSourceWhatNow
Oct 1, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTOpen
Oct 1, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT DOOR, AT REFRIGERATOR IN THE KITCHEN LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTOpen
Oct 1, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTOpen
Oct 1, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL, AND AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTOpen
Sep 14, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE KITCHEN , THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 14, 2026HPD C§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 12:50 PM ET. BBL 1022210011.

Look up another building