6 floors · 3 apartments · 44,034 sq ft · built 1848 · class O5 · owner of record: 224 Centre Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 44,034 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 19, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OF A 6 STORIES BUILDING I OBSERVED SIDEWALK SHED IN PLACE ON EXPOSURES # 1,2,AND 3, UPON REVIEW THE DEPARTMENT RECORD TO VERIFY COMPLIANCE INSPECTION REVEALS THAT THERE IS NO PERMIT OBTAIN #39554272L | Jul 13, 2027 DEFAULT | $0 |
| Apr 15, 2026 | Construction CLASS - 1 ISSUED NOV FAILIER TO MANTAIN FOR CHIMNEY ON ROOF WITH MAJOR CRACK AND SLIGHT DELECTION; SPRINKLER SYSTEM OFF;WATER LEAKING IN BASEMENT; EXIT DOORS SCREWED CLOSED THUS CREATING SAFETY HAZARD, REPAIR AND/REPLACE #39184715X | Jun 25, 2026 DEFAULT | $0 |
| Apr 15, 2026 | Construction CLASS - 1 OBSERVED THROUGHOUT THE BUILDING SPRINKLER HEADS ARE OBSTRUCTED. ON THE SECOUND FLOOR THERE IS A LACK SPRINKLER COVERAGE UNDER THE MEZZANINE LEVEL IN THE NORTH SIDE APARTMENT AND NO SPINKLER COVERAGE ON SOUTH E #39184722Y | Jun 25, 2026 DEFAULT | $0 |
| Apr 15, 2026 | Construction CLASS - 1 OBSERVED IN THE BASEMENT WASTE LINES ARE NOT PROPERLY CAPPED AND FERNCO COUPLINGS ARE BEING USED ON WASTE LINES. THE EJECTOR PUMP DISCHARGE LINE IS IMPROPERLY INSTALLED THE WASTE LINE REDUCED IN SIZE SMALLER TH #39184725J | Jun 25, 2026 DEFAULT | $0 |
| Apr 15, 2026 | Construction CLASS - 1 OBSERVED IN THE BASEMENT WATER LEAKING FROM SPRINKLER SYSTEM PIPE ONTO THE FLOOR. SPRINKLER HEAD DAMAGED AND MISSING SPRINKLER PROTECTIVE GUARDS AROUND SPRINKLER HEADS WHICH IS CONTRARY TO CODE SECTIONS BC 101. #39184723X | Jun 25, 2026 DEFAULT | $0 |
| Apr 15, 2026 | Construction CLASS - 1 OBSERVED OUTSIDE IN FRONT OF THE BUILDING THE FIRE DEPARTMENT CONNECTION IS TOO CLOSE TO THE STEPS. AT THE REAR SIDE OF THE BUILDING FIRE DEPARTMENT CONNECTION MISSING CAPS WHICH IS CONTRARY TO CODE SECTIONS FC #39184724H | Jun 25, 2026 DEFAULT | $0 |
| May 12, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE WITH EXPIRED PERMIT. AT TIME OF INSPECTION SHED INSTALLED UNDER PERMIT NUMBER M00161861-I1-SH HAS AN EXPIRED PERMIT DATE OF 12-31-2020. THERE ARE NO UPDATED PERMITS ON F #39147758N | Jul 17, 2025 DEFAULT | $0 |
| Apr 21, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION OF A 6 STORIES BUILDING I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1 AND 2 UPON REVIEW THE DEPARTMENT RECORD TO VERIFY COMPLIANCE IT SHOWS THAT THE SIDEWALK SHED PERMIT HAD EXPIRED SI #39539342M | Jun 26, 2025 DEFAULT | $0 |
| Aug 20, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTES:MULTIPLEHAZARDOUS CONDITIONS OBSERVED BROKEN GLASS PANE.DELAMINATED/SPALLING MASONRY AT 2ND STRY AND 3RD STRY.DEFECTIVE AT 2ND STRY/CORNICE AT ROOF #35683968P | Oct 24, 2024 DEFAULT | $0 |
| Jul 1, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING FACADE IN A CODE-COMPLIANT MANNER. NOTED AT TIME OF INSPECTION, AT WEST ELEVATION EXPOSURE #1, NORTH ELEVATION EXPOSURE #2 AND EAST ELEVATION EXPOSURE #3 OBSERVED SEVERLY CRACKED MA #35680093H | Sep 5, 2024 DEFAULT | $0 |
| Feb 22, 2023 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OBSERVED SIDEWALK SHED AT EXP#1,2 AND 3. AFTER REVIEW DEPARTMENT RECORDS REVEALED THAT SIDEWALK SHED PERMIT EXPIRED ON 12/31/20. #39513389Y | Jun 1, 2023 IN VIOLATION | $0 |
| Feb 16, 2023 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF A 6 STORY BUILDING PARTIALLY OCCUPIED, NO CONSTRUCTION ACTIVITIES RECORDED WHILE RESPONDING TO A COMPLAINT CONCERNING UNSAFE SIDEWALK SHED I OBSERVED SHED PERMIT EXPIRED ON 12/31/2 #39513226J | Apr 27, 2023 ADMIT/IN-VIO | $0 |
| Nov 4, 2022 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON-SITE EXPIRED PERMIT.PERMIT#M00161861-L1-SH EXPIRED 11/31/20.AS OF TODAY 11/04/22 NO PERMIT IN PROGRESS OR ON RECORD.REMEDY:RENEW PERMIT. #35664591K | Aug 31, 2023 IN VIOLATION | $0 |
| Nov 4, 2022 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.OBSERVED FIRE ESCAPE EGRESS BLOCKED BY SIDEWALK SHED DEBRIS.REMEDY:REMOVE OBSTRUCTION #35664589L | Aug 31, 2023 IN VIOLATION | $0 |
| Nov 4, 2022 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. OBSERVED INADEQUATE SHED LIGHTING, DAMAGED MUD SILLS, TWISTED I-BEAMS, AND DAMAGED PARAPET WALL PANELS. REMEDY: COMPLY WITH CODE SPECIFICATIONS #35664593Y | Aug 31, 2023 IN VIOLATION | $0 |
| Nov 23, 2021 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION AT TIME OF INSPECTION ON A 6TH STY OBSERVED SIDEWALK SHED ERECTED AT EXPO#1.MISSING CAPS FROM THE BOLTS AT SWS CAN CREATED A HAZARDOUS CONDITION FOR PEDEST #35505052N | Feb 24, 2022 DEFAULT | $0 |
| Nov 23, 2021 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION AT TIME OF INSPECTION ON A 6TH STY OBSERVED SIDEWALK SHED ERECTED.OBSERVED THE PARAPET WALL NOT SECURE TO THE SWS.A OPEN GAP ABOUT 3-4 INCHES AT EXPO#2 CRE #35505053P | Feb 24, 2022 DEFAULT | $0 |
| Nov 19, 2021 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ONSITE WITH EXPIRED PERMIT(SWS).NOTE:AT INSPECTION OF 6 STORY ALT BLDG,NO ACTIVE WORK OBSERVED SIDEWALK SHED AT EXPOSURES 1,2&3 IN GOOD CONDITION BUT THE PERMIT NUMBER M00161861 #35504670X | Feb 17, 2022 DEFAULT | $0 |
| Jul 3, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS & APPURTENANCE. NOTE: AT 6 STY BROWNSTONE ALL EXPOSURES AT 5TH & 6TH FL MISSING BRICKS & MORTAR AT ROOF LEVELSHINGLES MISSING. REMEDY: SIDEWALK SHED INSTALLED PERMIT#M00161861. #35433980X | Sep 5, 2019 DEFAULT | $0 |
| Apr 30, 2019 | Construction CLASS - 2 SIDEWALK SHED PARAPET PANEL.NOTE:AT THE TIME OF MY INSPECTION,I OBSERVED A SIDEWALK SHED ERECTED AT EXPO 1,2 AND 3.I ALSO OBSERVED THAT THERE WERE NO PARAPET PANEL INFORMATION POSTED ON TEH SIDEWALK SHED PARAPE #35418443P | Jun 27, 2019 DEFAULT | $0 |
| Apr 30, 2019 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE NO PERMIT.NOTE:AT THE TIME OFMY INSPECTION I OBSERVED A SIDEWALK SHED ERECTED AT EXPO 1,2 AND 3.UPON REVIEW THE PERMIT VALIDITY ON THE BUILDING INFORMATION SYSTEM(BIS)IT #35418439M | Jun 27, 2019 DEFAULT | $0 |
| Apr 21, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR FACADE IN A CODE COMPLIANT MANNER. BROWN STONE IS FAILING,MISSING AND IN DANGER OF FALLING ON ENTIRE FACADE FRONTING CENTRE,GRAND AND BAXTER STREETS. DEFECTS ENDANGER THOUSANDS OF P #35407909Y | Jun 13, 2019 DEFAULT | $0 |
| Feb 27, 2013 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DOB FOR NOV#34852921X ISSUED ON 11/4/11 PURSUANT TO 28-204.4 & 1RCNY 102-01.WORK W/O A PERMIT ON THE 3RD FLR.RMDY:FILE A C #35039973M | May 30, 2013 WRITTEN OFF | $0 |
| Mar 11, 2011 | Unknown CLASS - 2 UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. RESPONDENT FAILED TO CORRECT THE CONDITIONS CITED IN THE PRIOR NOV #34852921X FOR WORK W/O A PERMIT @ 3RD FL COMMERCIAL SPACE UNDER RENOVATION. #34810395J | May 12, 2011 IN VIOLATION | $0 |
| Jan 31, 2011 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN A CODE-COMPLIANT MANNER,ILLEGAL DOOR HARDWARE. NOTED: AT FRONT ENTRANCE/EXIT DOOR A KEYED LOCK IS IN PLACE W/THEPOTENTIAL OF BEING LOCKED & NOT ABLE TO BE OPENED FROM INTERIOR. #34879626N | Aug 11, 2011 IN VIOLATION | $0 |
| Nov 4, 2010 | Unknown CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER IN THAT A STOP WORK ORDER HAS BEEN ISSUED & CONSTRUCTION WORK IS BEING PERFORMED W/O HAVING STOP WORK ORDER(RESIREDED). REMEDY: COMPLY W/COMMISSIO #34878545R | May 12, 2011 IN VIOLATION | $0 |
| Nov 4, 2010 | Construction CLASS - 1 WORK W/O PERMIT: AT 3RD FL RENOVATING COMM SPACE IN LANDMARK BUILDING NO PERMITS POSTED OR PLANS (APPROVED AT SITE. REMEDY: STOP ALL WORK & OBTAIN PERMITS. #34852921X | May 12, 2011 IN VIOLATION | $0 |
| Mar 2, 2010 | Unknown CLASS - 2 FAILURE TO COMPLY W/ AN ORDER OF THE COMMS RESPONDENT FAILED TO FILE A CERT OF CORRECTION FOR #34775265Z AT 2ND FL ERECTED PARTITION & CUT WOOD FL JOISTS REM; FILE CERT OF CORRECTION #34821765L | Apr 22, 2010 DEFAULT | $0 |
| Sep 8, 2009 | Unknown CLASS - 1 FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER. RESPONDENT HAS FAILED TO COMPLY WITH THE CONDITIONS IN #34775265-Z. 2ND FLR N/W UNIT PARTITIONS ERECTED WOOD FLR JOINTS WERE CUT DOWN IN SIZE. SPRINKLER #34807779L | Dec 17, 2009 DEFAULT | $0 |
| Sep 8, 2009 | Unknown CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FIRE A CERTIFICATE OF CORRECTION W/DEPT OF BUILDINGS. FOR THE VIOL #34775256-2. REMEDY: COMPLY W/CODE. FIRE CERTIFICATE OF CORRECTION. #34807780Z | Dec 17, 2009 DEFAULT | $0 |
| Apr 28, 2009 | Elevators CLASS - 2 42D6.42N9.58Y13.37M7.37D6.42D SECURE TIMER ON BACK OF CONTROLLER JUMPER ON 'SR RELAY 58 BEARING LEAK 37 PROVIDE SIGNAGE ON DOOR #38202749Y | Jun 18, 2009 DEFAULT | $0 |
| Apr 8, 2009 | Construction CLASS - 1 WORK W/O A PERMIT NOTED:AT 2ND STORY NORTH WEST CORNER COMMERICIAL UNIT PARTITIONS ERECTED MEZZANINE ERECTED CEILING ALTERED 3'X17'JOISTS CUT DOWN APPROX 4" TO 3"X13" SPRINKLER HEADS REMOVED SPRINKLER SYSTEM AL #34775256Z | May 28, 2009 IN VIOLATION | $0 |
| May 16, 1991 | Elevators Non-Hazardous 22Q,48T,49T,73O,08I, #38012376N | Aug 29, 1991 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 20, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.@CELLAR&SUBCELLAR LVLS,CRCKD WALLS &WALLS W/ MISSNG BRCKS WERE OBSRVD.CHIMNEY@ROOF NEAR THE MIDDLE OF EXP4 HAD MULT CRCKS&WAS STRAPPD.CELLAR&SUBCELLAR LVLS HAD PRE-EXISTNG.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.NYSPE TO SUBMIT MEANS&METHDS FOR TEMP SHORNG/STBLIZTN OF CHIMNE #FEU10201BP | DOB VIOLATION - ACTIVE |
| Apr 20, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN SAFE MANNER.@CELLAR&SUBCELLAR LEVELS,CRCKD WALLS&WALLS W/MISSNG BRCKS WERE OBSRVD.CHIMNEY@ROOF NEAR THE MIDDLE OF EXP4WALL HAD MULT CRCKS&WAS STRAPPED.CELLAR&SUBCELLAR.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB, 2.BLDG TO BE PERM RPAIRD UNDR PRMT STRT #FEU10202BP | DOB VIOLATION - ACTIVE |
| Apr 15, 2026 | PLUMBING OBSERVED IN THE BASEMENT WATER LEAKING FROM SPRINKLER SYSTEM PIPE ONTO THE FLOOR #26-01057 | DOB VIOLATION - ACTIVE |
| May 12, 2025 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT DUE TO VEHICLE IMPACTING SHED. AT TIME OF INSPECTION THE VERTICAL POST AND I-BEAM WAS BENT KNOCKING SHED OUT OF PLUMB. #25-00813 | DOB VIOLATION - ACTIVE |
| Sep 18, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00002 | DOB VIOLATION - ACTIVE |
| Jul 3, 2024 | IMMEDIATE EMERGENCY REMEDY IMMEDIATELY INSTALL 90' LINEAR FEET OFF SIDEWALK SHED AT EXPOSURE #1 CENTRE STREET. 80' LINEAR FEET OF SIDEWALK SHED AT EXPSOUR E #2 ON GRAND STREET AND 120' LINEAR FEET OF SIDEWALK SHED AT EXPOSURE #3 ON BAXTER STREET. TO PROTECT AND SECURE PUBLIC SAFETY #18510 | DOB VIOLATION - ACTIVE |
| Feb 12, 2024 | LANDMARK #24-0666 | DOB VIOLATION - ACTIVE |
| Feb 12, 2024 | LANDMARK #24-0665 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00049 | DOB VIOLATION - ACTIVE |
| Nov 5, 2022 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO MULTIPLE TWISTED I-BEAMS ON SIDEWALK SHED ON EXP3 EAST ELEVATION WITH UNSAFE CONDITION. SHED TO BE IMMED REPAIRED. REMEDY: REPAIR/REPLACE DAMAGED I-BEAMS #SR10202XN | DOB VIOLATION - ACTIVE |
| Nov 4, 2022 | CONSTRUCTION FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED CRACKED CHIMNEY, SEVERE SPALLING THROUGHOUT FACADE. DAMAGED CORNICE CRACKED WINDOW PANES, AND LEAKING PARAPET WALL. DEFECTIVE WINDOW LINTALS AND SILLS. SPALLING BRICK AND STONE. ALL DEFECTS ARE THROUGHOUT FACADE. REMEDY: MAINTAIN BLDG IN A CODE COMPLIANT M #SR10201XN | DOB VIOLATION - ACTIVE |
| Nov 18, 2021 | CONSTRUCTION VEHICLE IMPACTING SIDEWALK SHED #ER02MP | DOB VIOLATION - ACTIVE |
| Apr 7, 2021 | ELEVATOR #9027/700918 | DOB VIOLATION - ACTIVE |
| Apr 7, 2021 | ELEVATOR #9027/700919 | DOB VIOLATION - ACTIVE |
| Apr 15, 2020 | ELEVATOR #9027/675367 | DOB VIOLATION - ACTIVE |
| Apr 15, 2020 | ELEVATOR #9027/675368 | DOB VIOLATION - ACTIVE |
| Aug 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00057 | DOB VIOLATION - ACTIVE |
| Jul 24, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00009 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00092 | DOB VIOLATION - ACTIVE |
| Nov 7, 2014 | LANDMARK #15-0404 | DOB VIOLATION - ACTIVE |
| Mar 13, 2014 | ELEVATOR #9028/503993 | DOB VIOLATION - ACTIVE |
| May 4, 2011 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00013 | DOB VIOLATION - ACTIVE |
| Oct 20, 2010 | CONSTRUCTION #C0201MT | DOB VIOLATION - ACTIVE |
| Oct 4, 2000 | LANDMARK #01-0211 | DOB VIOLATION - ACTIVE |
| Jul 31, 1987 | LANDMARK #88-0080 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 20, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Sep 18, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jul 24, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 4, 2011 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:49 AM ET. BBL 1002350013.