4 floors · 48,000 sq ft · built 1906 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-01 (Accepted). Agency page | Dec 31, 2026 in 69 days | 3 of 5 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 48,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 6, 2026 | Construction CLASS - 2 REISSUE#35721334H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY LIGHTS#10,11,12,13,18,19,20,21,22,24,25,2 #35731968Z | Aug 7, 2026 POP/IN-VIO | $0 |
| Aug 7, 2025 | Construction CLASS - 2 REISSUE ECB #35684877Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY LIGHTS NOT WORKING WHEN TESTED #35721334H | Aug 29, 2025 POP/IN-VIO | $0 |
| Sep 18, 2024 | Construction CLASS - 2 REISSUE#35672956Y FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:ON THE FOURTH FLOOR NEXT TO ROOM 406,404,401,408A,S #35684877Y | Nov 29, 2024 POP/IN-VIO | $0 |
| May 16, 2023 | Construction CLASS - 2 REISSUE #35643221K. DATE OF ISSUE: 3/29/2022. FAILURE TO MAINTAIN IN CODE COMPLIANT MANNER ILLUMINATION FOR EXIT, EXIT DISCHARGES AND PUBLICCORRIDORS PER BC1006.1; 27-381 AT THE TIME OF INSPECTION I OBSERVED AT #35672956Y | Nov 3, 2023 POP/IN-VIO | $0 |
| Mar 29, 2022 | Construction CLASS - 2 REISSUE #35557988P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER ILLUMINATE EXITS FOR EXITS DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1; 27-381 AT TIME OF INSPECTION OBSERVED EXITING EMERGENCY LIGHT WIL #35643221K | Jul 15, 2022 POP/IN-VIO | $0 |
| Apr 23, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES&PUBLIC CORRIDORS PER BC1006.1;27-381.NOTED:OBSERVED EXISTING EMERGENCY LIGHTS W/BATTERY BACKUP POWER@4FL STAIRD,3FL EXIT3, #35557988P | Jul 16, 2021 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 6, 2026 | ECB | Construction: REISSUE#35721334H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY LIGHTS#10,11,12,13,18,19,20,21,22,24,25,2 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 7:39 PM ET. BBL 2022800040.