6 floors · 17 apartments · 20,524 sq ft · built 2024 · class D3 · owner of record: Hp Morris Heights Ncp Housing Developmen T Fund Com
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 15, 2025 | Construction CLASS - 1 I OBSERVED A BAKERS OR SIMILAR PORTABLE SCAFFOLD ERECTED IN THE STAIRWELL, WITH PLANKS EXTENDING TO THE LANDING AT THE ROOF LEVEL. IT WAS MISSING THE BASE PLATES OR WHEELS AND GUARDRAIL SYSTEM WHICH IS CONTRARY #39544913N | Jan 4, 2027 | $2,500 |
| Sep 15, 2025 | Construction CLASS - 1 I OBSERVED THE ELEVATOR SHAFT OPEN AND MISSING A GUARDRAIL TO PREVENT WORKERS FROM FALLING APPROXIMATELY 5 FOOT 6 INCHES INTO THE ELEVATOR PIT. STOP ALL WORK AT ELEVATOR SHAFT OPENING ALL LEVELS. PROVIDE MEANS #39544912L | Jan 4, 2027 | $5,000 |
| Mar 18, 2025 | Construction CLASS - 1 DURING MY INSPECTION OF AN ACTIVE 6-STORY NB. I OBSERVED WORKERS PERFORMING WORK AT THE 6-FLOOR LEVEL UNENCLOSED PERIMETER NOT TIED OFF AND NO TEMPORARY GUARDRAILS IN PLACE. STOP ALL 6-FLOOR WORK OPERATIONS AND #39538100P | Dec 1, 2026 DEFAULT | $12,500 |
| Mar 18, 2025 | Construction CLASS - 1 DURING MY INSPECTION. I OBSERVED ON THE 6-FLOOR LEVEL ACTIVE WORK WITH MULTIPLE UNCAPPED REBARS AT A LOW HEIGHT, THIS CONSTITUTES A DANGER OF WORKERS/DOB/EMERGENCY/ FDNY FALLING ONTO SHARP EDGES RISKING IMPALEM #39538101R | Dec 1, 2026 DEFAULT | $6,250 |
| Mar 18, 2025 | Unknown CLASS - 2 DURING MY INSPECTION. I OBSERVED INADEQUATE LIGHTING STAIRWAY BETWEEN 2ND FLOOR, AND 3RD FLOOR. THIS CONSTITUTES A DANGER OF TRIPS AND FALLING HAZARDS. PROVIDE ADEQUATE BC 3303.2.3.1 TEMPORARY LIGHTING FOR ACTI #39538102Z | Dec 1, 2026 DEFAULT | $5,000 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 7:44 PM ET. BBL 2028770278.