3 floors · 3 apartments · 3,265 sq ft · built 1960 · class C0 · owner of record: Bakth, Sheyeb
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 22, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35578307N ISSUED ON 07/09/21 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR FAILURE TO MAINTAIN B #35565248J | Mar 29, 2022 IN VIOLATION | $1,250 |
| Jul 9, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED AT THE TIME OF MY INSEPCTION OBSERVED AT 3RD FLOOR BALCONY HAS BEEN REMOVED OR COLLAPSED LEAVING STRUCTURAL STEEL ON THE LEFT AN DRIGHT SIDE EXPOSED T #35578307N | Sep 28, 2021 DEFAULT | $12,500 |
| Mar 29, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED AT EXP#1 ON 3RD FL BALCONY HAS BEEN REMOVED(01)COLLAPSED LEAVING STRUCTURE STEEL ON THE LEFT & RIGHT SIDE.IT'S DANGEROUS CONDITIO #35555886P | Jun 22, 2021 DEFAULT | $12,500 |
| Jan 8, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT EXP#1;THE RD FL BALCONY HAS BEEN REMOVED OR HAS COLLAPSED,LEAVING STRUCTURAL STEEL ON THE LEFT & RIGHT SIDE EXPOSED TO THE ELEMENTS CREATING A HAZARD #35542846H | Oct 12, 2021 IN VIOLATION | $3,125 |
| Jun 17, 2020 | Construction CLASS - 2 AT FRONT OF BUILDING INSTALLED TEMPORARY BRACING FOR 2ND FLOOR BALCONY WITHOUT PERMITS, OBTAIN ALL PERMITS; PROVIDE LICENSED ENGINEER REPORT FOR STRUCTURAL STABILITY #39024096N | Mar 2, 2021 IN VIOLATION | $625 |
| Jun 17, 2020 | Construction CLASS - 1 AT FRONT OF BUILDING, 3RD FLOOR BALCONY MISSING DUE TO WATER DAMAGING DECK JOISTS CAUSING BALCONY TO COLLAPSE., REPAIR AND/REPLACE #39024097P | Mar 2, 2021 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Sep 29, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00586 | DOB VIOLATION - ACTIVE |
| Jun 23, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00594 | DOB VIOLATION - ACTIVE |
| Mar 31, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00466 | DOB VIOLATION - ACTIVE |
| Sep 16, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00541 | DOB VIOLATION - ACTIVE |
| Jun 22, 2020 | CONSTRUCTION EMERGENCY WORK:3 STORY MASN WALLS AND WOOD FRAMED FLOORS SEMI ATTACHED RESIDENTIAL BUILDING.THE 3RD FLOOR BALCONY HAD COLLAPSED ON 2ND FLOOR BALCONY.2ND FLOOR BALCONY WAS DAMGED AND SHOWS SIGNIFICANT DEFLECTION AND IS IN DANGER OF COLLAPSE.IMMEDIATELY PROVIDE TEMPORARY SHORING AT 2ND FLOOR BALCONY U #FEU40801XC | DOB VIOLATION - ACTIVE |
| Jun 22, 2020 | CONSTRUCTION FAILURE TO MAINTAIN:3 STRY MASONRY WALLS AND WOOD FLOORS SEMI-ATTACHED BUILDING.THE 3RD FLOOR BALCONY HAD COLLAPSED.THE 2ND FLOOR BALCONY WAS DAMAGED AND WAS DEFLECTING & IS IN STATE OF DISREPAIR.OWNER TO ENGAGE NYS PE AND CONTRACTOR TO REPAIR BUILDING UNDER PERMIT.FILE BY 7/1/20 START BY 7/15/20 #FEU40802XC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Sep 29, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 23, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 31, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 16, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 9:43 AM ET. BBL 4098580043.