4 floors · 23 apartments · 17,840 sq ft · built 1930 · class C1 · owner of record: C&Z Realty Co
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-08 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 21, 2026 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE VESTIBULE AT PUBLIC HALL, 1st STORY | Oct 26, 2026 |
| Sep 21, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING IN THE VESTIBULE AT PUBLIC HALL, 1st STORY | Oct 26, 2026 |
| Sep 21, 2026 | B | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Oct 26, 2026 |
| Sep 21, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE VESTIBULE AT PUBLIC HALL, 1st STORY | Dec 25, 2026 |
| Jun 26, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Sep 29, 2026 |
| Jan 8, 2024 | C | Apt C4 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Feb 1, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE VESTIBULE AT PUBLIC HALL, 1st STORY | Open |
| Sep 21, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING IN THE VESTIBULE AT PUBLIC HALL, 1st STORY | Open |
| Sep 21, 2026 | HPD B | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Open |
| Sep 21, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE VESTIBULE AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 7:33 AM ET. BBL 3066220066.