4 floors · 34,520 sq ft · built 1930 · class J5 · owner of record: 210 West 50th Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,520 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-07 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 5, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION, AT IN A NEW YORK MINUTE GRAB AND GO STORE AT 1ST FLOOR EXP 1 OF PREMISES, AT EXTERIOR 1ST AND 2ND FLOORS, AWNING, ILLUMINATED SIGN, ELECTRIC LIGHTS AND ELECTRICAL WIRING INSTALLED, ALL WI #39100753X | Mar 7, 2024 IN VIOLATION | $2,500 |
| Mar 3, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED OBSERVED HORIZONTAL AND VERTICAL CRACKS AT EXP2(BROADWAY)AT TOP FLOOR LEVEL.NO OVERHEAD PROTECTION PROVIDED AT EXP2.REMEDY:REPAIR AND/OR REPLACE. #35635830X | Jun 2, 2022 IN VIOLATION | $3,125 |
| Nov 10, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION NOTED:FACADE AT EXP.#2 HAS VERTICAL & HORIZONTAL CRACKS IN MASONRY AT MULTIPLE LOCATIONS AT 2/3 FLS.CURRENT S.W.S DOES NOT PROVIDE ADEQUA #35631611H | Jun 16, 2022 IN VIOLATION | $3,125 |
| Dec 1, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALL AND APPURTENANCES.NOTED:AT EXPO#1 OBSERVED:STEPCRACKS,BROKEN AND DISPLACED BRICKS,BROKEN AND DETACHED STUCCO.REM:REPLACE OR REPAIR #35546105Z | Jun 24, 2021 IN VIOLATION | $1,250 |
| Jun 22, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BUIDLING IN CODE COMPLIANT MANENR NOTE AT TIME FO INSPECTION OBSERVED BUILDING IN PLACE IWTH STEP CRACKS ON EXTEIRO AND BULGING BRICKS COMPLY WITH CODE MAINTAIN EXTERIOR WALLS #35480984P | Jul 8, 2021 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #02906 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #02903 | DOB VIOLATION - ACTIVE |
| Feb 7, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00016 | DOB VIOLATION - ACTIVE |
| Oct 20, 2020 | ELEVATOR #9027/691895 | DOB VIOLATION - ACTIVE |
| Oct 20, 2020 | ELEVATOR #9027/691894 | DOB VIOLATION - ACTIVE |
| Sep 27, 2019 | ELEVATOR #9027/658689 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #01796 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #01795 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #02266 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #02186 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #02400 | DOB VIOLATION - ACTIVE |
| Aug 15, 2012 | ELEVATOR #ACC101382 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #00856 | DOB VIOLATION - ACTIVE |
| Oct 18, 1991 | CONSTRUCTION #C-1AM01 | VIOLATION UNSERVED ECB-ACTIVE |
| Oct 18, 1991 | CONSTRUCTION #C-1AM01 | DOB VIOLATION - ACTIVE |
| Feb 26, 1991 | CONSTRUCTION #C4AM01 | VIOLATION UNSERVED ECB-ACTIVE |
| Oct 30, 1989 | BOILER #32004058J | DOB VIOLATION - ACTIVE |
| Sep 20, 1989 | CONSTRUCTION #C4RD02 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Aug 24, 2026 | GHG Emissions - LL97 FTX-EN-LL97320 | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Feb 7, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Aug 15, 2012 | Elevators E | Active |
| Aug 15, 2012 | Elevators E | Active |
| Aug 15, 2012 | Elevators E | Active |
| Aug 15, 2012 | Elevators E | Active |
| Aug 15, 2012 | Elevators E | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Aug 24, 2026 | DOB Safety | GHG Emissions - LL97: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 11:09 PM ET. BBL 1010210045.