2 floors · 2 apartments · 2,964 sq ft · built 1910 · class S2 · owner of record: Ahm Realty Management Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 19, 2026 | Construction CLASS - 1 WWOP: ATOI, WORK WAS OBSERVED IN THE REAR YARD FOR AN AWNING INSTALLATION ATTACHED TO THE REAR FACADE. THE STRUCTURE SPANS APPROXIMATELY 25 FEET IN WIDTH, SITS ABOUT 10 FEET ABOVE GROUND LEVEL, AND PROJECTS APP #39189138H | Dec 18, 2026 DEFAULT | $12,500 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 16, 2024 | A | § 27-2023 ADMIN. CODE: PROVIDE SUFFICIENT,PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Aug 19, 2024 |
| May 16, 2024 | B | § 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE YARD AT WEST | Jun 20, 2024 |
| Mar 10, 2023 | B | § 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE NORTH YARD | Apr 14, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 7:11 AM ET. BBL 2040000009.