3 floors · 3 apartments · 3,264 sq ft · built 1899 · class C0 · owner of record: Edith Stark As Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Apr 11, 2008 | CONSTRUCTION #0117MS | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 26, 2008 | A | D26-21.03 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS ON WALL NEAR STAIRS ALL STORIES PUB HALLS. | Sep 29, 2008 |
| Jun 26, 2008 | B | D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CREEN WIRE GUARD OVER & UNDER ROOF SKYLIGHT. | Jul 31, 2008 |
| Jun 26, 2008 | B | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS 3RD STY PUBLIC HALL. | Jul 31, 2008 |
| Jun 26, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SHEET ROCK PARTITION WITH DOOR DECREASING AREABY 3 INCHES 1ST STORY PUBLIC HALL. | Sep 29, 2008 |
| Jun 26, 2008 | A | D26-20.08 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING. | Sep 29, 2008 |
| Jun 26, 2008 | C | D26-17.10 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDING'S HEATING SYSTEM 1 STY PUB HALL & BOILER ROOM DOOR. | Jul 2, 2008 |
| Jun 26, 2008 | C | D26-17.10 ADM CODE PROVIDE READY ACCESS TO BUILDING'S HEATING SYSTEM FRONT ENTRANCE DOOR LOCKED TO CELLAR. | Jul 2, 2008 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 6:08 PM ET. BBL 3022110029.