Queens · Block 10102 · Lot 10 · 11432

162-24 Jamaica Avenue

6 floors · 38,255 sq ft · built 1931 · class O5 · owner of record: Slj Of Jamaica Ave Llc

28open violations
$22,300ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-19 (Accepted). Agency page

Dec 31, 2026
in 43 days
2 of 2 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 38,255 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027

Open violations

ECB / OATH (6) · $22,300 owed
IssuedViolationHearingBalance
Mar 16, 2026Unknown CLASS - 1
AT TIME OF INSPECTION, OBSERVED SUPPORTED SCAFFOLD AT EXPOSURES 1 AND 4 WITH LOOSE SAFETY NETTING, LOOSE PLANKING THROUGHOUT SCAFFOLD, OUTRIGGERS INSTALLED CONTRARY TO APPROVED DOCUMENTS, AND MISSING GUARDRAIL
#39551795R
Jan 4, 2027
DEFAULT
$5,000
Mar 16, 2026Construction CLASS - 1
AT TIME OF INSPECTION, OBSERVED MATERIALS STORED ON SIDEWALK SHED AT EXPOSURES 1 AND 4 CONTRARY TO APPROVED CONSTRUCTION DOCUMENTS, WHICH STATES THAT NO MATERIALS SHALL BE STORED ON THE SHED. CONDITION CREATES
#39551794P
Jan 5, 2027
DEFAULT
$6,250
Feb 25, 2026Construction CLASS - 2
AT TIME OF INSPECTION (5:45AM) OBSERVED NO LIGHTING UNDER THE SIDEWALKSHED CREATING UNSAFE CONDITIONS TO THE PUBLIC SUCH AS TRIP AND FALL HAZARDS THAT CAN LEAD TO SERIOUS INJURIES. GC #625438MAINTAIN SIDEWALK
#39550871P
May 5, 2026
IN VIOLATION
$2,400
May 7, 2025Construction CLASS - 2
PEDESTRIAN PORTION DOSE NOT MEET CODE SPECIFICATIONS BC3307.6.4.8. UNDER SIDE OF SWH PASSAGEWAY NOT ILLUMINATED BY ELECTRIC LIGHT (INOPERABLE SHED ELECTRIC LIGHT FIXTURES) DURING NO DAYLIGHT AS PER CODE BC3307.
#39539911N
May 5, 2026
IN VIOLATION
$2,400
Feb 17, 2023Boilers CLASS - 2
NO COMBUSTIBLE STORAGE IN BOILER ROOM, MISSING FRONT SIGHT GLASS ON BOILER, SAIL SWITCH INOPERATIVE, NO OVERFLOW PIPING ON CONDENSATE TANK, MISSING RATINGS PLATE, MISSING TEST LEVER ON RELIEF VALVE. CORRECT ALL
#39079910R
Apr 25, 2023
DEFAULT
$3,125
Feb 17, 2023Boilers CLASS - 2
FOUND OUT OF SERVICE WEIL MCLAIN BOILER MODEL P-368V-W MUST BE PROPERLY REMOVED AND SUBMIT A CERTIFICATE OF CORRECTION.
#39079911Z
Apr 25, 2023
DEFAULT
$3,125
DOB (4)
IssuedViolationStatus
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2401801
DOB VIOLATION - ACTIVE
Dec 1, 2023FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2301820
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#40194
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#44960
DOB VIOLATION - ACTIVE
DOB NOW Safety (22)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Dec 1, 2023Energy Grade - LL33 FTP-EN-EGRDEA
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 2:21 AM ET. BBL 4101020010.

Look up another building