Brooklyn · Block 6640 · Lot 13 · 11223

1616 East 9 Street

4 floors · 86,700 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education

40open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
167dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 86,700 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 411 days
Next cycle year 2027
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6640). Agency page

Dec 31, 2030
in 1507 days
Next due 2030
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-10 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (9)
IssuedViolationHearingBalance
Jul 22, 2026Construction CLASS - 2
REISSUE#35692110Z DATE OF ISSUE:03.14.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL GAS METER ROOM SIGNS OF WATER INFILTRATION THROUGH F
#35734347J
Aug 20, 2026
POP/IN-VIO
$0
Jul 22, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1008.1;27-381.AT THETIME OF INSPECTION OBSERVED AND NOTED AT 4TH FL GYM 2 EMER.EXIT LIGHTS
#35734348L
Aug 20, 2026
POP/IN-VIO
$0
Aug 15, 2025Boilers CLASS - 2
EASTMOND BOILER MODEL# PLW-231. WHISKER SWITCH ON FRESH AIR DAMPER INOPERABLE. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION.
#39157221M
Aug 25, 2025
POP/IN-VIO
$0
Aug 15, 2025Boilers CLASS - 2
EASTMOND BOILER MODEL# PLW-231. WHISKER SWITCH ON FRESH AIR LOUVER INOPERABLE. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION.
#39157220K
Aug 25, 2025
POP/IN-VIO
$0
Mar 14, 2025Construction CLASS - 2
REISSUE #35682859L: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: OBSERVED @ CELLAR LEVEL GAS METER ROOM SIGNS OF WATER INFILTRATION THROUGH FOUNDATION WALLS CAUSED SPALLING AND STAINS. REMEDY: REPAIR
#35692110Z
Apr 16, 2025
POP/IN-VIO
$0
Jun 6, 2024Construction CLASS - 2
REISSUE#35672054P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT CELLAR LEVEL IN THE GAS METER ROOM THERE ARE SIGNS OF WATERPENETRATION FROM THE FOUNDATION WALL.REM:REPAIR AND/OR REPLACE.
#35682859L
Aug 14, 2024
POP/IN-VIO
$0
Mar 6, 2023Construction CLASS - 2
REISSUE#35655157N.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT GAS METER ROOM WATER PENETRATION FROM FOUNDATION WALL,SPALLING CRACKS.REMEDU:REPAIR AND/OR REPLACE.
#35672054P
Jun 14, 2023
POP/IN-VIO
$0
Aug 11, 2022Boilers CLASS - 2
GAS PRESSURE GAUGE@TOP OF BURNER HAS GAS CONNECTION WITHOUT A SHUTOFF VALVE AND IS NOT HARD PIPED/GAS PIOLIT REGULATOR IS DEFECTIVE/COMBUSTION AIR LOUVER WHISKER SWITCH IS DEFECTIVE/AIR COMPRESSOR AIR STATION I
#39067936R
Aug 20, 2022
POP/IN-VIO
$0
Jan 15, 2020Elevators CLASS - 2
RESTORE SERVICE TO DEVICE
#39015826L
Jan 23, 2020
POP/IN-VIO
$0
DOB (6)
IssuedViolationStatus
Oct 13, 2021ELEVATOR

#9028/709918
DOB VIOLATION - ACTIVE
Dec 6, 2019ELEVATOR

#9028/666883
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#09970
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#11546
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#12452
DOB VIOLATION - ACTIVE
Jun 1, 2016NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#03029
DOB VIOLATION - ACTIVE
DOB NOW Safety (25)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Sep 6, 2019Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Jun 1, 2016Elevators EVCAT5
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Jul 22, 2026ECBConstruction: REISSUE#35692110Z DATE OF ISSUE:03.14.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL GAS METER ROOM SIGNS OF WATER INFILTRATION THROUGH FOpen
Jul 22, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1008.1;27-381.AT THETIME OF INSPECTION OBSERVED AND NOTED AT 4TH FL GYM 2 EMER.EXIT LIGHTSOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 3:27 AM ET. BBL 3066400013.

Look up another building