4 floors · 86,700 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 86,700 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 411 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6640). Agency page | Dec 31, 2030 in 1507 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 22, 2026 | Construction CLASS - 2 REISSUE#35692110Z DATE OF ISSUE:03.14.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL GAS METER ROOM SIGNS OF WATER INFILTRATION THROUGH F #35734347J | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 22, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1008.1;27-381.AT THETIME OF INSPECTION OBSERVED AND NOTED AT 4TH FL GYM 2 EMER.EXIT LIGHTS #35734348L | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 15, 2025 | Boilers CLASS - 2 EASTMOND BOILER MODEL# PLW-231. WHISKER SWITCH ON FRESH AIR DAMPER INOPERABLE. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION. #39157221M | Aug 25, 2025 POP/IN-VIO | $0 |
| Aug 15, 2025 | Boilers CLASS - 2 EASTMOND BOILER MODEL# PLW-231. WHISKER SWITCH ON FRESH AIR LOUVER INOPERABLE. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION. #39157220K | Aug 25, 2025 POP/IN-VIO | $0 |
| Mar 14, 2025 | Construction CLASS - 2 REISSUE #35682859L: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: OBSERVED @ CELLAR LEVEL GAS METER ROOM SIGNS OF WATER INFILTRATION THROUGH FOUNDATION WALLS CAUSED SPALLING AND STAINS. REMEDY: REPAIR #35692110Z | Apr 16, 2025 POP/IN-VIO | $0 |
| Jun 6, 2024 | Construction CLASS - 2 REISSUE#35672054P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT CELLAR LEVEL IN THE GAS METER ROOM THERE ARE SIGNS OF WATERPENETRATION FROM THE FOUNDATION WALL.REM:REPAIR AND/OR REPLACE. #35682859L | Aug 14, 2024 POP/IN-VIO | $0 |
| Mar 6, 2023 | Construction CLASS - 2 REISSUE#35655157N.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT GAS METER ROOM WATER PENETRATION FROM FOUNDATION WALL,SPALLING CRACKS.REMEDU:REPAIR AND/OR REPLACE. #35672054P | Jun 14, 2023 POP/IN-VIO | $0 |
| Aug 11, 2022 | Boilers CLASS - 2 GAS PRESSURE GAUGE@TOP OF BURNER HAS GAS CONNECTION WITHOUT A SHUTOFF VALVE AND IS NOT HARD PIPED/GAS PIOLIT REGULATOR IS DEFECTIVE/COMBUSTION AIR LOUVER WHISKER SWITCH IS DEFECTIVE/AIR COMPRESSOR AIR STATION I #39067936R | Aug 20, 2022 POP/IN-VIO | $0 |
| Jan 15, 2020 | Elevators CLASS - 2 RESTORE SERVICE TO DEVICE #39015826L | Jan 23, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 13, 2021 | ELEVATOR #9028/709918 | DOB VIOLATION - ACTIVE |
| Dec 6, 2019 | ELEVATOR #9028/666883 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #09970 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #11546 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #12452 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #03029 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Jun 1, 2016 | Elevators EVCAT5 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Jul 22, 2026 | ECB | Construction: REISSUE#35692110Z DATE OF ISSUE:03.14.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL GAS METER ROOM SIGNS OF WATER INFILTRATION THROUGH F | Open |
| Jul 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1008.1;27-381.AT THETIME OF INSPECTION OBSERVED AND NOTED AT 4TH FL GYM 2 EMER.EXIT LIGHTS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 3:27 AM ET. BBL 3066400013.