Bronx · Block 4168 · Lot 13 · 10461

1616 Crosby Avenue

8 floors · 61 apartments · 34,761 sq ft · built 2022 · class D7 · owner of record: First Structure Llc

6open violations
$1,600ECB/OATH penalties owed
1HPD class C (immediately hazardous)
58dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 58 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 74 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 34,761 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 302 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 475 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 789 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $1,600 owed
IssuedViolationHearingBalance
Oct 20, 2025Unknown CLASS - 1
DURING THE INSPECTION, ELECTRICAL WORK WAS FOUND INSTALLED ACROSS THE ENTIRE FIRST FLOOR OF THE COMMERCIAL SPACE WITHOUT ANY PERMITS ON FILE. NOTABLY, BX CABLES WERE CONNECTED TO A PANEL AND USED FOR OUTLETS.,
#39164062J
Nov 23, 2026
PENDING
$1,600
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
HPD (4) · C 1 · B 3 · A 0
IssuedClassViolationCorrect by
Oct 31, 2026BApt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKETL AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST—
Aug 27, 2026B§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE EXIT SIGN AT CEILING ( NEAR EXIT SIGN) AT PUBLIC HALL, 7th STORYOct 1, 2026
Dec 3, 2025BApt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC UNIT AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 4th APARTMENT FROM NORTH AT EASTJan 7, 2026
Nov 13, 2025CApt 8G · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 8G, 8th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 13, 2025

Issued in the last 120 days

DateSourceWhatNow
Oct 31, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKETL AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Aug 27, 2026HPD B§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE EXIT SIGN AT CEILING ( NEAR EXIT SIGN) AT PUBLIC HALL, 7th STORYOpen
Jul 31, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8G, 8th STORY, 2nd APARTMENT FROM NORTH AT EASTClosed
Jul 31, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8G, 8th STORY, 2nd APARTMENT FROM NORTH AT EASTClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 8:19 PM ET. BBL 2041680013.

Look up another building