3 floors · 110,000 sq ft · built 1927 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 57 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-11-08 (Accepted). Agency page | Dec 31, 2026 in 57 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 110,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1355). Agency page | Dec 31, 2035 in 3344 days | Next due 2035 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 1ST FL LIBRARY NOT INSTALLED/PROVIDED WITH NO EMERGE #35722566L | Apr 27, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 REISSUE ECB#35691728X EXIT DOOR NOT SELF CLOSING.NOTED AT GROUND LEVELCAFETERIA,GYM,AUDITORIUM,EXIT 4,5,6,2,STAIR C 1ST FL STAIR B,EXIT 7,9 2ND FL STAIR B,3RD FL STAIR B DOORS ARE IN DISREPAIR/NOT CLOSING WHEN #35722564H | Apr 27, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT OUTSIDE/FENCE NEAR EXIT 6 BLOCKED/OBSTRUCTED WALKWAY SEALED/LOCKED.REM:COMPLYWITH CODE. #35722568P | Apr 27, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 REISSUE ECB#35691727Y FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT GROUND LEVEL GYM,CAFETERIA,AUDITORIUM EMERGE #35722565J | Apr 27, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 2ND & 3RD FLOOR HALLWAYS INSTALLED NON FIRE RETARTED DECORATIONS TO/ON CEILINGS.REM:COMPLY WITH CODE. #35722567N | Apr 27, 2026 POP/IN-VIO | $0 |
| Apr 2, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.NOTED:EXIT 9 STAIRWAY B ON THE SECOND FLOORTHE DOOR ON THE LEFT IS NOT CLOSING,THE DOOR IS HITTING ON THE DOOR FRAME,EXIT 9 ON THE FIRST FLOOR THE DOOR ON THE LEFT AND RIGHT IS NOT OP #35691728X | Jul 9, 2025 POP/IN-VIO | $0 |
| Apr 2, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT EXIT 9 THREE LIGHTS,EXIT 2 TWO LIGHTS,EXIT 9 NEXT TO ROOM 29 THREE #35691727Y | Jul 9, 2025 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21499 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21500 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 1:02 AM ET. BBL 3013550023.