| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-20 (Accepted). Agency page | Dec 31, 2026 in 57 days | 3 of 5 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 116,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 422 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1614). Agency page | Dec 31, 2034 in 2979 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 20, 2026 | Construction CLASS - 2 REISSUED ECB#3572415H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED RUSTY AND NOT FUNCTIONING FLAG POLE.REM:REPAIR AND/OR REPLACE. #35724869H | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 20, 2026 | Construction CLASS - 2 REISSUED ECB#35724614X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED PENETRATION AT ELECTRICAL ROOM AND OUTSIDE AT ELECTRICAL ROOM.OBSERVED RUSTY ELECTRICAL EQUIPMENT.REM:REPAIR AND/OR REPLACE. #35724870P | Aug 5, 2026 POP/IN-VIO | $0 |
| Sep 3, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE FLAGPOLE AT THIS SCHOOL IS NOT USABLE BECAUSE THE COMPONENTS ARE NOT WORKING. REMEDY: REPAIR/REPLACE. #35724615H | Oct 14, 2025 POP/IN-VIO | $0 |
| Sep 3, 2025 | Construction CLASS - 2 RE-ISSUE #35677595X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CELLAR LEVEL, THERE IS WATER PENETRATION IN ELECTRICALRM, AND FAN ROOM THAT APPEARS TO BE GROUND WATER. REMEDY: REPAIR/REPLA #35724614X | Oct 14, 2025 POP/IN-VIO | $0 |
| Aug 8, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTED:AT CELLAR,FAN ROOM# 1 AND 2,INFRONT OF ELECTRICAL ROOM 1"WATER PUDDED NOTED AND IN SIDE THE ELECTRICAL ROOM WATER PENETRATION FROM THE GROUND.REM:MAKE #35677598X | Oct 17, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #21527 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #21528 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #24654 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 20, 2026 | ECB | Construction: REISSUED ECB#3572415H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED RUSTY AND NOT FUNCTIONING FLAG POLE.REM:REPAIR AND/OR REPLACE. | Open |
| Jul 20, 2026 | ECB | Construction: REISSUED ECB#35724614X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED PENETRATION AT ELECTRICAL ROOM AND OUTSIDE AT ELECTRICAL ROOM.OBSERVED RUSTY ELECTRICAL EQUIPMENT.REM:REPAIR AND/OR REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 7:12 PM ET. BBL 1016140021.