7 floors · 16 apartments · 15,986 sq ft · built 2016 · class D3 · owner of record: 1613 Mermaid Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 828 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1141 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 9, 2019 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENTS FAILED TO PERFORM DUTIES PER CODE. AT THETIME OF INSPECTION,I OBSERVED PROPOSED 7 STY NEW BLDG COMPLETE TO ROOFW/WORK ACTIVITY PRESENT. I ALSO OBSERVED SUPERINTENDENT FAILED TO DOCU #35441468R | Aug 11, 2020 DEFAULT | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Jul 27, 2021 | ELEVATOR #9028/706883 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #37700 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 8, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 11, 2026 |
| Feb 23, 2026 | B | Apt 401 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT THE CEILING IN THE BATHROOM LOCATED AT APT 401, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 30, 2026 |
| Feb 23, 2026 | B | Apt 401 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT THE CEILING IN THE KITCHEN LOCATED AT APT 401, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 30, 2026 |
| Feb 23, 2026 | B | Apt 401 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK SET AT DOOR LEADING TO BALCONY IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 401, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 30, 2026 |
| Feb 23, 2026 | B | Apt 401 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 401, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 30, 2026 |
| Feb 23, 2026 | B | Apt 401 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE BATHROOM LOCATED AT APT 401, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 30, 2026 |
| Jun 13, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 16, 2025 |
| Apr 22, 2025 | C | Apt 301 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES . IN THE ENTIRE APARTMENT LOCATED AT APT 301, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 28, 2025 |
| Apr 22, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCK ED AT BOILER ROOM | Apr 28, 2025 |
| Apr 21, 2025 | C | Apt 301 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM NORTH LOCATED AT APT 301, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 18, 2025 |
| Apr 17, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 21, 2024 |
| Mar 31, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 4, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 5:31 PM ET. BBL 3070210049.