7 floors · 178,452 sq ft · built 1926 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 178,452 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1957). Agency page | Dec 31, 2027 in 432 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $330,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 484 days | No Cycle 10 report on record yet |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-11 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 6, 2026 | Construction CLASS - 2 REISSUE#35726687X FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.EXP#7 HAS CRACKED GLASS OVER MAIN DOORS.ALSO NOTED EXIT#F,B,A.REM:COMPLY WITH CODE. #35734475Y | Jul 27, 2026 POP/IN-VIO | $0 |
| Jul 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT CELLAR AREA THERE OS CONSTANT WATER POURING FROM CEILING.REM:COMPLY WITH CODE. #35734476X | Jul 27, 2026 POP/IN-VIO | $0 |
| Jul 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.CORRIDOR DOUBLE DOORS ARE MISSING 2ND,3RD FLOORS.REM:COMPLY WITH CODE. #35734477H | Jul 27, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 EAST(1) CRACKED/BROKEN WINDOWS MULTI LOC. (2)CRACKED/SPALLING STONE MASONRY MULTI LOC.-ROOF-CRACKED/BRO #35726687X | Mar 13, 2026 POP/IN-VIO | $0 |
| Aug 13, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES.-NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 EAST (1)CRACKED/SPALLING STONE MASONRY AT NORTH EAST END MULTI LOC.-CRACKED/BROKEN WINDOW GLASS AT EXP #35718367R | Sep 17, 2025 POP/IN-VIO | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906734.REM:SUBMIT ACCEPTABLE REQUIRED T #37027177X | Jun 13, 2024 POP/IN-VIO | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7B AND 8B INDICATION CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REQUIRED BY 28-302.5 FOR CONTROL #806734. REMEDY: FILE ACCEPTABLE REPORT. #37025997M | Jan 23, 2024 POP/IN-VIO | $0 |
| Feb 22, 2022 | Construction CLASS - 1 RESPONDENT USED BOOM TRUCK CD#5187 TO PERFORM CONSTRUCTION ACTIVITIES WITHOT A CD8, COMPLY WITH CODE; PROVIDE CD8 #39056524R | Dec 22, 2022 IN VIOLATION | $0 |
| May 29, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIR #36027525R | Aug 20, 2015 POP/IN-VIO | $0 |
| Feb 19, 2010 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. MATERIAL HOIST ON SITE NOT SHOWN ON SCAFFOLD PLAN. REMEDY: CONFORM TO APPROVED DOCUMENTS OR AMENDMENTS. #34821534Y | Apr 15, 2010 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01686 | DOB VIOLATION - ACTIVE |
| Jul 5, 2018 | FACADE SAFETY PROGRAM #HAZ87511 | DOB VIOLATION - ACTIVE |
| Nov 13, 2012 | LL11/98-LOCAL LAW 11/98 - FACADE CYCLE 7 UNSAFE REPORT FILED #HAZ73817 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01640 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Jul 5, 2018 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Nov 13, 2012 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 6, 2026 | ECB | Construction: REISSUE#35726687X FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.EXP#7 HAS CRACKED GLASS OVER MAIN DOORS.ALSO NOTED EXIT#F,B,A.REM:COMPLY WITH CODE. | Open |
| Jul 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT CELLAR AREA THERE OS CONSTANT WATER POURING FROM CEILING.REM:COMPLY WITH CODE. | Open |
| Jul 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.CORRIDOR DOUBLE DOORS ARE MISSING 2ND,3RD FLOORS.REM:COMPLY WITH CODE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 10:08 PM ET. BBL 1019570078.