Manhattan · Block 1957 · Lot 78 · 10031

161 Convent Avenue

7 floors · 178,452 sq ft · built 1926 · class W1 · owner of record: Nyc Department Of Education

27open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 178,452 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1957). Agency page

Dec 31, 2027
in 432 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $330,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 484 days
No Cycle 10 report on record yet
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-11 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (10)
IssuedViolationHearingBalance
Jul 6, 2026Construction CLASS - 2
REISSUE#35726687X FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.EXP#7 HAS CRACKED GLASS OVER MAIN DOORS.ALSO NOTED EXIT#F,B,A.REM:COMPLY WITH CODE.
#35734475Y
Jul 27, 2026
POP/IN-VIO
$0
Jul 6, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT CELLAR AREA THERE OS CONSTANT WATER POURING FROM CEILING.REM:COMPLY WITH CODE.
#35734476X
Jul 27, 2026
POP/IN-VIO
$0
Jul 6, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.CORRIDOR DOUBLE DOORS ARE MISSING 2ND,3RD FLOORS.REM:COMPLY WITH CODE.
#35734477H
Jul 27, 2026
POP/IN-VIO
$0
Feb 5, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 EAST(1) CRACKED/BROKEN WINDOWS MULTI LOC. (2)CRACKED/SPALLING STONE MASONRY MULTI LOC.-ROOF-CRACKED/BRO
#35726687X
Mar 13, 2026
POP/IN-VIO
$0
Aug 13, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES.-NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 EAST (1)CRACKED/SPALLING STONE MASONRY AT NORTH EAST END MULTI LOC.-CRACKED/BROKEN WINDOW GLASS AT EXP
#35718367R
Sep 17, 2025
POP/IN-VIO
$0
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906734.REM:SUBMIT ACCEPTABLE REQUIRED T
#37027177X
Jun 13, 2024
POP/IN-VIO
$0
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7B AND 8B INDICATION CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REQUIRED BY 28-302.5 FOR CONTROL #806734. REMEDY: FILE ACCEPTABLE REPORT.
#37025997M
Jan 23, 2024
POP/IN-VIO
$0
Feb 22, 2022Construction CLASS - 1
RESPONDENT USED BOOM TRUCK CD#5187 TO PERFORM CONSTRUCTION ACTIVITIES WITHOT A CD8, COMPLY WITH CODE; PROVIDE CD8
#39056524R
Dec 22, 2022
IN VIOLATION
$0
May 29, 2015Local Law CLASS - 2
FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIR
#36027525R
Aug 20, 2015
POP/IN-VIO
$0
Feb 19, 2010Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. MATERIAL HOIST ON SITE NOT SHOWN ON SCAFFOLD PLAN. REMEDY: CONFORM TO APPROVED DOCUMENTS OR AMENDMENTS.
#34821534Y
Apr 15, 2010
DEFAULT
$0
DOB (4)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01686
DOB VIOLATION - ACTIVE
Jul 5, 2018FACADE SAFETY PROGRAM

#HAZ87511
DOB VIOLATION - ACTIVE
Nov 13, 2012LL11/98-LOCAL LAW 11/98 - FACADE
CYCLE 7 UNSAFE REPORT FILED
#HAZ73817
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01640
DOB VIOLATION - ACTIVE
DOB NOW Safety (13)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Jul 5, 2018Facades FISP
CYCLE 8B UNSAFE REPORT FILED
Active
Nov 13, 2012Facades LL11/98
CYCLE 7 UNSAFE REPORT FILED
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 6, 2026ECBConstruction: REISSUE#35726687X FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.EXP#7 HAS CRACKED GLASS OVER MAIN DOORS.ALSO NOTED EXIT#F,B,A.REM:COMPLY WITH CODE.Open
Jul 6, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT CELLAR AREA THERE OS CONSTANT WATER POURING FROM CEILING.REM:COMPLY WITH CODE.Open
Jul 6, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.CORRIDOR DOUBLE DOORS ARE MISSING 2ND,3RD FLOORS.REM:COMPLY WITH CODE.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 10:08 PM ET. BBL 1019570078.