class V1 · owner of record: Polaris Lexington Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 15, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION, OBSERVED EXCAVATION WORK AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. PORTIONS OF THE EXCAVATION EXCEEDED 6 FEET IN DEPTH, WITH MISSING GUARDRAILS AT OPEN EDGES, CREA #39560593N | Dec 24, 2026 PENDING | $2,500 |
| Oct 15, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, EXCAVATION WORK WAS IN PROGRESS AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. EARTHWORK NOTIFICATION WAS REQUESTED FROM THE CONSTRUCTION SUPERINTENDENT BUT WAS NOT PRO #39560592L | Dec 24, 2026 PENDING | $1,250 |
| Aug 26, 2026 | Construction CLASS - 1 OBS. ACTIVE EXCAVATION AT BOTH LOT LINES CONTRARY TO APPROVED SOE. REQ'D PERIMETER SOE PER B-E/SOE-202 NOT INSTALLED AS EXCAVATION ADVANCED, LEAVING ADJ. RUBBLE-STONE FNDNS. EXPOSED/UNSUPPORTED. EXCAVATOR/SPOIL #39558436R | May 13, 2027 PENDING | $2,500 |
| Aug 26, 2026 | Site Safety CLASS - 1 OBS. ACTIVE EXCAVATION ADJACENT TO ADJOINING BLDGS. UPON REQUEST, COMPETENT PERSON FAILED TO PROVIDE REQ'D PRECONSTRUCTION SURVEY DOCUMENTING EXISTING CONDITIONS OF ALL ADJ. BLDGS. SURVEY NOT MAINTAINED ON SITE #39558437Z | May 13, 2027 PENDING | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 15, 2026 | ECB | Unknown: AT TIME OF INSPECTION, OBSERVED EXCAVATION WORK AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. PORTIONS OF THE EXCAVATION EXCEEDED 6 FEET IN DEPTH, WITH MISSING GUARDRAILS AT OPEN EDGES, CREA | Open |
| Oct 15, 2026 | ECB | Construction: AT TIME OF INSPECTION, EXCAVATION WORK WAS IN PROGRESS AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. EARTHWORK NOTIFICATION WAS REQUESTED FROM THE CONSTRUCTION SUPERINTENDENT BUT WAS NOT PRO | Open |
| Aug 26, 2026 | ECB | Construction: OBS. ACTIVE EXCAVATION AT BOTH LOT LINES CONTRARY TO APPROVED SOE. REQ'D PERIMETER SOE PER B-E/SOE-202 NOT INSTALLED AS EXCAVATION ADVANCED, LEAVING ADJ. RUBBLE-STONE FNDNS. EXPOSED/UNSUPPORTED. EXCAVATOR/SPOIL | Open |
| Aug 26, 2026 | ECB | Site Safety: OBS. ACTIVE EXCAVATION ADJACENT TO ADJOINING BLDGS. UPON REQUEST, COMPETENT PERSON FAILED TO PROVIDE REQ'D PRECONSTRUCTION SURVEY DOCUMENTING EXISTING CONDITIONS OF ALL ADJ. BLDGS. SURVEY NOT MAINTAINED ON SITE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 9:57 PM ET. BBL 1016290016.