3 floors · 2 apartments · 4,208 sq ft · built 1930 · class S2 · owner of record: 104-52 164 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-25 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 10, 1997 | CONSTRUCTION #16M03 | DOB VIOLATION - ACTIVE |
| Mar 10, 1997 | CONSTRUCTION #16M03 | VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 11, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS LIT AT ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Jul 16, 2026 |
| Jun 11, 2026 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AT PUBLIC HALL, 3rd STORY | Jul 16, 2026 |
| Jun 11, 2026 | B | Apt 3RDFLO · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT EAST WALL IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 16, 2026 |
| Jun 11, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 16, 2026 |
| Jun 11, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE FOYER LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 16, 2026 |
| Jun 11, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 16, 2026 |
| Jun 11, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 16, 2026 |
| Jun 11, 2026 | B | Apt 3RDFLO · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASTE LINE UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 16, 2026 |
| Apr 24, 2025 | B | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE HEATING RISER PIPE AT EAST IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 29, 2025 |
| Apr 22, 2025 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE HANDRAIL ADJACENT TO SCUTTLE LADDER AT PUBLIC HALL, 3rd STORY | May 27, 2025 |
| Feb 18, 2025 | C | Apt 3 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 17, 2025 |
| Apr 28, 2022 | B | Apt 3RDFLO · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 2, 2022 |
| Apr 28, 2022 | B | Apt 3RDFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 2, 2022 |
| Apr 27, 2022 | C | Apt 3RDFLO · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 26, 2022 |
| Apr 22, 2022 | B | Apt 3FL · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 27, 2022 |
| Apr 22, 2022 | B | Apt 3FL · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 27, 2022 |
| Apr 22, 2022 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 27, 2022 |
| Apr 22, 2022 | B | Apt 3FL · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 27, 2022 |
| Apr 21, 2022 | C | Apt 3FL · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 21, 2022 |
| Apr 21, 2022 | C | Apt 3FL · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 21, 2022 |
| Aug 3, 2017 | A | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2017 |
| Aug 3, 2017 | A | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WEST WALL IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2017 |
| Jan 4, 2010 | C | Apt 3 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SAGGING CONCRETE AND CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Jan 10, 2010 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 2:37 PM ET. BBL 3035180034.